Laserfiche WebLink
Mr. W.T. Nickerson <br /> March 12, 2001 <br /> Page 2 <br /> Bonding correspondence prepared by the County in October 1998 is enclosed for reference. Sierra-Pacific <br /> will pay the encroachment permit fees. The permits will reportedly be issued when all the fees and <br /> assurance bonds are received by Public Works. The address is as follows: <br /> San Joaquin County Department of Public Works <br /> P.O. Box 1810 <br /> 1810 East Hazelton Avenue <br /> Stockton, California 95201 Attn: John Wotila <br /> Sierra-Pacific has notified West Hazmat Drilling that the installation work will not likely take place next <br /> week as planned. Sierra-Pacific will notify Amy Terrell (RWQCB)that the well installations will have to <br /> postponed a few weeks longer. <br /> Sincerely, <br /> SIERRA-PACIFIC GROUP <br /> Jo St p en Ra p, C.E.G. 1133 Eric D. Chase, C.E.G. 1088 <br /> Senior Engineering Geologist Senior Engineering Geologist <br /> JSR/EDC/dk <br /> C. M. Infuma, San Joaquin County Environmental Health <br /> J. Wotila, San Joaquin County Public Works <br /> A. Terrell, RWQCB <br /> Enclosure <br />