My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRED RUSSO
>
5420
>
1600 - Food Program
>
PR0526416
>
COMPLIANCE INFO_PRE 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 4:53:46 PM
Creation date
12/7/2018 2:38:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2016
RECORD_ID
PR0526416
PE
1632
FACILITY_ID
FA0017872
FACILITY_NAME
SUSD-GEORGE BUSH ELEMENTARY SCHOOL
STREET_NUMBER
5420
STREET_NAME
FRED RUSSO
STREET_TYPE
DR
City
STOCKTON
Zip
95212
APN
12806006
CURRENT_STATUS
01
SITE_LOCATION
5420 FRED RUSSO DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\F\FRED RUSSO\5420\PR0526416\COMPLIANCE PRE 2016.PDF
QuestysFileName
COMPLIANCE PRE 2016
QuestysRecordDate
3/29/2016 8:32:25 PM
QuestysRecordID
3043348
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
67/29/2002 14:45 FAX _ 10008 <br /> 1. Minimum Requirements for Food Facility Plans <br /> Plans shall be drawn to scale. The recommended scale is 114 inch=1 foot and shall include the following: <br /> 0 A. Name and address of the food facility;the name, mailing address and telephone number of owner, <br /> contractor and contact person. <br /> B. vicinity map. <br /> C_ Floor plan of entire facility. <br /> D, Floor plan showing equipment layout including: (See Appendix A) <br /> a)Complete equipment checklist,including the methods of installation. (See Appendix B) <br /> b)Equipment manufacturer specification sheets and/or elevations. <br /> ❑ E. Plumbing layout. <br /> 0 F. Electrical layout. <br /> G. Exhaust hood ventilation and make-up air systems. Complete the attached worksheet for each hood. <br /> (See Appendix C) <br /> H- A site plan including proposed waste storage receptacle location. <br /> 1, Room finish schedule for floors,base,walls and ceiling that indicates the type of material;the color and <br /> the surface finish for each room or area. Give specific <br /> end z brand <br /> names. <br /> Samples or specifications of <br /> proposed finish materials May be required- (See App <br /> II. Field Construction Inspection Procedure <br /> D A. Preliminary Construction Inspection <br /> Contact the health department to request a preliminary construction inspection priorto installation of equipment. <br /> 13 6. Final Construction Inspection <br /> Upon completion of construction, including finishing work, contact the health department to arrange for a final <br /> construction inspection. Approved materials and good workmanship are significant factors in the evaluation and <br /> final field approval of food facility construction and equipment Installation. A final inspection should be requested <br /> no less than five(5)working days prior to the proposed opening of the establishment. Final construction must be <br /> approved by this agency prior to opening for business or use of remodeled areas. <br /> 7 <br /> EHD 16-01-001 <br /> REVISED 02-21-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.