Laserfiche WebLink
PLUMBING FIXTURE SCHEDULE (OWNER SUPPLIED) PLUMBING FIXTURE SCHEDULE (CONTRACTOR SUPPLIED) ABBREVIATIONS GENERAL NOTES <br /> TAG DESCRIPTION TRIM / ACCESSORIES WASTE VENT HOT COLD TAG DESCRIPTION TRIM / ACCESSORIES WASTE VENT HOT COLD A/E ARCHITECT/ENGINEER LB POUND 1. CONTRACTOR SHALL PROVIDE A COMPLETE PLUMBING SYSTEM FOR THE PROJECT. ITEMS OR WORK <br /> AB ABOVE MBH THOUSAND BTUH NOT SHOWN OR SPECIFIED ON THE PLUMBING DRAWINGS, BUT REQUIRED FOR THE COMPLETE <br /> AFF ABOVE FINISHED FLOOR MECH MECHANICAL PLUMBING SYSTEM, SHALL BE PROVIDED AND SHALL CONFORM WITH ACCEPTED TRADE PRACTICES, Imb <br /> FLORAL PREP SINK: FAUCET: ENCORE; 14" SWING. BACKFLOW PREVENTER: PROVIDE WITH AN AIR GAP FITTING LOCAL CODES AND GOVERNING AUTHORITIES. <br /> FA-105 WINHOLT; WS1T2424LD12DP18-SVKT ROTARY WASTE LEVER INDIRECT - 3/4" 3/4" BFP-1 ZURN; 375XL, 3/4" - - - 3/4" AFG ABOVE FINISHED GRADE MCA MINIMUM CIRCUIT AMPACITY <br /> AHJ AUTHORITY HAVING JURISDICTION MIN MINIMUM 2. THE PLUMBING DRAWINGS ARE SCHEMATIC IN NATURE AND ARE TO CONVEY DESIGN INTENT ONLY. STAMP <br /> FA-106 STERILOX DISPENSER - - - 3/4" FCO FLOOR CLEANOUT: NO-HUB CONNECTION, ROUND NICKEL-BRONZE STRAINER, SEE PLAN _ - - ARCH. ARCHITECTURAL MOCP MAXIMUM OVERCURRENT PROTECTION COORDINATE AND FIELD-LOCATE PIPING AND EQUIPMENT LOCATIONS PRIOR TO FABRICATION OR <br /> ZURN; Z1400-ZN-HD HEAVY DUTY. FOR SIZE BFP BACKFLOW PREVENTER MPG MEDIUM PRESSURE GAS INSTALLATION, TO MEET JOB REQUIREMENTS. REQUIRED OFFSETS, FITTINGS AND GENERAL <br /> INSTALLATION REQUIREMENTS ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE OWNER OR �pEESSIOHq <br /> BHP BRAKE HORSEPOWER MS MOP SINK Q ! <br /> FLOOR SINK: 12"X12" WITH DEEP TRAP SEAL TRAP, CAST IRON NO HUBCD CONDENSATE (N) NEW DESIGN TEAM SHALL NOT BE RESPONSIBLE FOR MATERIAL PLACED DIRECTLY FROM THE PLUMBING =�k��pM S. BRp <br /> SEE PLAN �Fyc� <br /> FS-1 ZURN; ZN-1900-K-2-32 CONNECTION. OPEN HALF CAST IRON GRATE, AND ALUMINUM 2 DRAWINGS. <br /> OR CWV - - y ?� <br /> DOME STRAINER. FOR SIZE COTG CLEANOUT TO GRADE NIC NOT IN CONTRACT J <br /> CW COLD WATER NTS NOT TO SCALE 3. ALL WORK AND MATERIALS SHALL CONFORM TO ALL APPLICABLE LOCAL AND STATE CODES AND <br /> WALL HUNG LAVATORY FAUCET: ZURN; Z6915 BATTERY OPERATED, 0.5 GPM CWV COMBINATION WASTE & VENT OC ON CENTER ALL OTHER AUTHORITIES HAVING JURISDICTION. M 40100 �r <br /> LAV-1 ZURN; Z5344 PIPE COVERING: TRUEBRO; LAV GUARD. 2" 1-1/2" 1/2" 1/2" (D) DEMO OD OUTSIDE DIMENSION 4. ALL DIMENSIONS LISTED ARE IN INCHES, UNLESS NOTED OTHERWISE. <br /> PLATE CARRIER: ZURN; MODEL Z1224 DFU DRAINAGE FIXTURE UNIT OFRWL OVERFLOW RAINWATER LEADER <br /> F <br /> DIA. DIAMETER PC PLUMBING CONTRACTOR 5. FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES NECESSARY TO FURNISH, <br /> MOP SINK: INCLUDE MOP SINK FAUCET WITH VACUUM BREAKER, WALL 0712-6121MS-1 ZURN; Z1996-24 BRACE AND 3/4" THREADED SPOUT. 3" 2" 3/4" 3/4" DN DOWN POC POINT OF CONNECTION FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTED ON THE DRAWINGS. <br /> (E) EXISTING PSI POUNDS PER SQUARE INCH 6. CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS BID AND THOROUGHLY <br /> THERMOSTATIC MIXING VALVE: PROVIDE W/ CHECKSTOPS, OUTLET BALL VALVE, AND DIAL _ _ EA. EACH (R) RELOCATE/RELOCATED FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS & EXACT NATURE OF THE WORK. SUBMISSION <br /> MXV-1 LEONARD; 210-SB THERMOMETER. SET TO 129F DELIVERY TEMPERATURE. 1 2 1 2 EFF EFFICIENCY REF. REFERENCE OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A COMPLETE & FUNCTIONAL <br /> WALL MOUNTED URINAL: FLUSH VALVE: ZURNZER6000AV-WSIBATTERY OPERATEDEOR ENGINEER OF RECORD RO REVERSE OSMOSIS SYSTEM. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDING <br /> ; , , <br /> UR-1 3 2 - 1 EW EYEWASH RPBP REDUCED PRESSURE BACKFLOW FOR ANY OMISSIONS WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION. <br /> ZURN; 25751, WHITE. 0.5GPF. WALL CARRIER: ZURN; 21221. F FAHRENHEIT PREVENTER <br /> FCO FLOOR CLEANOUT RPM REVOLUTIONS PER MINUTE 7. LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY EXACT LOCATIONS <br /> 4„ <br /> FLOOR MOUNTED WATER CLOSET: FLUSH VALVE: ZURN; ZER6000AV-WSI, BATTERY OPERATED, 1.28 AND DEPTHS OF UTILITIES PRIOR TO STARTING WORK OF THIS SECTION. MAKE REQUIRED L7 N o <br /> WC-1 ZURN; Z5655-BWL, WHITE. GPF. SEAT: ZURN; Z5955SS-EL, WHITE. 2„ - 1-1/4 FD FLOOR DRAIN RTU ROOFTOP UNIT ADJUSTMENTS TO CONNECT TO UTILITIES. IF INDICATED POINTS OF CONNECTION CANNOT BE MADEr- u <br /> z �, �, <br /> FLA FULL LOAD AMPS RWL RAINWATER LEADER TO EXISTING UTILITIES AS FOUND. THE CONTRACTOR SHALL, BEFORE CONTINUING, NOTIFY THE <br /> FLOOR MOUNTED WATER CLOSET (ACCESSIBLE): FLUSH VALVE: ZURN; ZER6000AV-WSI, BATTERY OPERATED, 1.28 FPM FEET PER MINUTE SCW SOFT COLD WATER ENGINEER PRIOR TO INSTALLING ANY WORK WHICH MAY BE AFFECTED. N <br /> WC-2 ZURN; Z5665-BWL, WHITE. GPF. SEAT: ZURN; Z5955SS-EL, WHITE. 4 2 - 1-1/4 W <br /> FPS FEET PER SECOND SD STORM DRAIN W 000 aa) <br /> 8. ALL DIMENSIONS AND LOCATIONS PER ARCHITECTURAL DRAWINGS. CL <br /> WALL CLEANOUT: PROVIDE WITH STAINLESS STEEL WALL ACCESS COVER. SEE PLAN FS FLOOR SINK SF SQUARE FOOT Z ro <br /> WCO - - - FT FOOT (FEET) SEN. SENSIBLE N <br /> ZURN; 21469-ZS FOR SIZE 9. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY AVAILABLE SPACES FOR INSTALLING THEco <br /> FU FIXTURE UNIT SP STATIC PRESSURE WORK. z O <br /> G NATURAL GAS SS SANITARY SEWER W IN <br /> GA GAUGE SQ. SQUARE <br /> 10. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH & WORKMANLIKE MANNER SATISFACTORY TO <br /> PIPING MATERIAL SCHEDULE GPM GALLONS PER MINUTE TDL TOTAL DEVELOPED LENGTH z <br /> AND MEETING THE APPROVAL OF THE ENGINEER AND ARCHITECT. <br /> GW GREASE WASTE T&P TEMPERATURE AND PRESSURE 00 0- <br /> TW TEMPERED WATER 11. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR & MATERIAL ON ALL WORK AGAINST " <br /> LOCATION MATERIAL HB HOSE BIBB Q <br /> HP HORSEPOWER TYP. TYPICAL DEFECTS IN WORKMANSHIP & MATERIALS FOR A PERIOD OF ONE YEAR. i� <br /> WASTE AND VENT ABOVE GROUND NO HUB CAST IRON HVAC HEATING, VENTILATION AND AIR CONDITIONING UH UNIT HEATER <br /> HW HOT WATER LINO UNLESS NOTED OTHERWISE 12. ALL MATERIALS, APPLIANCES & EQUIPMENT SHALL BE NEW & THE BEST OF THEIR RESPECTIVE 0• <br /> HWR HOTWATER RETURN VPH VOLTS KIND. FREE FROM ALL DEFECTS AND OF THE MAKE, BRAND, AND QUANTITY SPECIFIED.PHASE ,. <br /> WASTE AND VENT BELOW GROUND SCH 40 PVC PIPE WITH DWV FITTINGS / 00 <br /> ID INSIDE DIAMETER V VENT O <br /> WATER INSIDE BUILDING COPPER TYPE "L" WITH LEAD FREE SOLDER IE INVERT ELEVATION VBS VENT BELOW SLAB 13. CATALOG INFORMATION & CUTS OF ALL EQUIPMENT, DEVICES & TRIM SHALL BE SUBMITTED FOR IN <br /> REVIEW. ALL SUBMITTALS TO BE APPROVED TO ARCHITECT, ENGINEER. <br /> INSULATE ALL HOT WATER PIPING. IN INCH VTR VENT THRU ROOF <br /> WATER BELOW GROUND SCH 80 PVC OR HDPE PIPE AND FITTINGS IN. WG INCHES WATER GAUGE W WATT 14. CLEAN-OUTS SHALL BE INSTALLED AS PER THE PLUMBING CODE. <br /> IM ICE MACHINE WC WATER CLOSET OR WATER COLUMN <br /> GAS PIPING SCH 40 BLACK STEEL KW KILOWATT WCO WALL CLEANOUT 15. PROVIDE FELT WITH METAL BACKING VIBRATION ISOLATION SLEEVES OR PADS AT ALL PIPE HANGERS <br /> LAV LAVATORY WFU WATER FIXTURE UNIT OR SUPPORTS AND ALL POINTS WHERE PIPING COMES IN CONTACT WITH ANY PORTION OF THE <br /> CONDENSATE PIPING HARD DRAWN COPPER * NOTE THAT NOT ALL ABBREVIATIONS LISTED IN THIS LEGEND WILL BE UTILIZED ON THIS PROJECT STRUCTURE. APPLIES TO ALL WATER AND WASTE PIPING. PROVIDE FELT AROUND ALL PVC PIPING <br /> AT SUPPORTS FOR THERMAL EXPANSION. <br /> a� } <br /> NOTE: PLUMBING CONTRACTOR TO FOLLOW CALIFORNIA PLUMBING CODE FOR ALL PIPING MATERIALS. <br /> 16. ALL PIPES SHALL BE SUPPORTED AND BRACED. r o Q <br /> LEGEND 17. PLUMBERS TAPE WILL NOT BE ACCEPTED AS A PERMANENT SUPPORT FOR ANY PIPING OR 00 <br /> 2019 CALGREEN FIXTURE FLOW RATES DEVICES. <br /> 10 <br /> LO <br /> CD CONDENSATE PIPING <br /> FIXTURE TYPE MAXIMUM FLOW RATE 18. VALVES SHALL BE FULL PORT, BRONZE 1/4 TURN BALL TYPE. 4" TO 6" SHALL BE GATE VALVE <br /> COLD WATER PIPING BRONZE BODY, RISING STEM. SERVICE PRESSURE SHALL BE SUITABLE FOR SERVICE INTENDED. > N <br /> PROVIDE AND INSTALL IDENTIFICATION TAGS ON ALL VALVES. VALVES IN EXPOSED COMMON AREAS C) o °' a <br /> SHOWERHEADS 1.8 GPM @ 80 PSI - - HOT WATER PIPING TO HAVE LOCKING HANDLES. NO IRON BODY VALVES WILL BE ACCEPTED. N m o <br /> aD a o <br /> LAVATORY FAUCETS - NONRESIDENTIAL 0.5 GPM @ 60 PSI - - - HOT WATER RETURN PIPING19. PROVIDE AND INSTALL DIELECTRIC UNIONS BETWEEN ALL COPPER AND GALVANIZED & IRON PIPING Q) U No E <br /> KITCHEN SINKS 1.8 GPM @ 60 PSI G NATURAL GAS PIPING & COMPONENTS. o o <br /> c 1 } a) <br /> -SS- - SANITARY SEWER PIPING 20. PENETRATIONS IN WALLS, FLOORS, OR CEILINGS, WHICH REQUIRE PROTECTED OPENINGS SHALL BE a- Q <br /> LO <br /> WASH FOUNTAINS 1.8 GALLONS/CYCLE/20 [RIM SPACE (IN.) @ 60 PSI] - Z 0 <br /> FIRE-STOPPED. FIRE-STOPPING SHALL BE AN APPROVED MATERIAL. INSTALLATION INSTRUCTIONS r 3 Q 2 <br /> c Ill <br /> -GW- - GREASE WASTE PIPING SHALL BE MADE AVAILABLE TO THE INSPECTION AUTHORITY AND BE MAINTAINED AT THE JOB SITE. CD 3 0 <br /> METERING FAUCETS 0.2 GALLONS/CYCLE I� Q 3 <br /> [ ( ) ] CWV COMBINATION WASTE & VENT 21 FPROVIDE LOORS. WATERTIGHT FLASHING WHEREVER PIPES PASS THROUGH EXTERIOR WALLS, ROOF AND <br /> METERING FAUCETS FOR WASH FOUNTAINS 0.2 GALLONS/CYCLE/20 RIM SPACE IN. @ 60 PSI <br /> ---------- VENT PIPING <br /> GRAVITY TYPE WATER CLOSETS 1.28 GALLONS/FLUSH 22. CUTTING AND PATCHING: ALL CUTTING & PATCHING OF THE EXISTING STRUCTURE SHALL BE <br /> @ FLOOR DRAIN PROVIDED. PROVIDE ALL NECESSARY REQUIREMENTS TO THE PROJECT MANAGER. PROTECTION <br /> FLUSHOMETER TANK WATER CLOSETS 1.28 GALLONS/FLUSH AGAINST DUST AND DEBRIS SHALL BE TO THE SATISFACTION OF THE PROJECT MANAGER. 10 <br /> ® FLOOR SINK <br /> FLUSHOMETER VALVE WATER CLOSETS 1.28 GALLONS/FLUSH ® HUB DRAIN 23. UPON COMPLETION OF THE WORK UNDER THIS SECTION THE CONTRACTOR SHALL REMOVE ALL <br /> SURPLUS MATERIALS. EQUIPMENT & DEBRIS INCIDENTAL TO THIS WORK & LEAVE HE PREMISESV) <br /> ELECTROMECHANICAL HYDRAULIC WATER CLOSETS 1.28 GALLONS/FLUSH ,o; ROOF DRAIN CLEAN AND ORDERLY. PROVIDE NEW CEILING TILES (TO MATCH EXISTING) IF ANY DAMAGED DURING loon <br /> CONSTRUCTION. <br /> URINALS 0.125 GALLONS/FLUSH o VENT THRU ROOF -..MMNEEENNINkwr <br /> 24. WASTE PIPE SIZES THAT ARE 3 INCHES OR SMALLER SHALL BE EVALUATED AT 2% SLOPE. MEOW <br /> NOTE: ALL NONCOMPLIANT PLUMBING FIXTURES SHALL BE REPLACED WITH WATER-CONSERVING PLUMBING HOSE BIBB IONENNW <br /> FIXTURES. FIXTURE REPLACEMENT IS REQUIRED PRIOR TO FINAL INSPECTION. 25. PROVIDE ACCESS DOORS TO ALL CONCEALED VALVES, STRAINERS, TRAP PRIMERS, ETC./ PROVIDE <br /> ISI GAS VALVE ISSUE&REVISIONS <br /> STAINLESS STEEL ACCESS PANELS & FRAMES FOR ALL TILED AREAS. NO. DATE: DESC: <br /> �a SHUT OFF VALVE 07.30.2021 AGENCIES 1 ST SUBMITTAL <br /> 26. ALL PIPING IN FINISHED AREAS SHALL BE RUN CONCEALED. EXPOSED PIPING, WHERE NECESSARY, <br /> �a®�a BACK FLOW PREVENTER SHALL RUN AS HIGH AS POSSIBLE AND TIGHT TO THE WALLS. <br /> d� PRESSURE REDUCING VALVE 27. NO VENT OUTLET SHALL TERMINATE CLOSER THAN FOUR FEET TO OR ONE FOOT ABOVE ANY DOOR, <br /> WINDOW OR GRAVITY AIR INTAKE, NOR CLOSER THAN TEN FEET TO OR THREE FEET ABOVE ANY <br /> d� PRESSURE REGULATOR FORCED OR MECHANICAL AIR INTAKE. <br /> r� CHECK VALVE 28. INSTALL WATER HAMMER ARRESTORS ON EACH COLD AND HOT WATER FIXTURE BRANCH AS <br /> CLEANOUT RECOMMENDED BY PLUMBING AND DRAINAGE INSTITUTE. DEVICES SHALL BE FACTORY MADE WITH <br /> PERMANENT CUSHION OF GAS OR AIR. PROVIDE ACCESS PANEL. <br /> REFRIGERATION DISPLAY CASE. 04 WALL CLEANOUT 29. NEW POTABLE WATER SYSTEMS SHALL BE DISINFECTED PRIOR TO USE ACCORDING TO THE <br /> CASE CONDENSATE DRAIN LINE UNDER-COUNTER LOCATION ABOVE-CEILING LOCATION <br /> BY REFRIGERATION CONTRACTOR o PIPE UP METHODS SET IN THE LOCAL PLUMBING CODE. <br /> C PIPE DOWN 30. THIS PROJECT CONSISTS OF RENOVATION, MODIFICATION AND/OR ADDITION OF NEW WORK TO AN <br /> Il EXISTING FACILITY. WHILE SIGNIFICANT EFFORT HAS BEEN MADE TO REFLECT ACCURATE EXISTING <br /> `` PIPE TEE CONDITIONS, ACCURACY OF THE DRAWINGS IS NOT GUARANTEED. <br /> FINISH o CW w <br /> /,,,"-FLOOR COUNTER C 31. FIELD-VERIFY EXISTING CONDITIONS PRIOR TO BID. ANY DISCREPANCIES WHICH MAY AFFECT THE <br /> 1/2" HIGH STAINLESS CONTRACTORS BID SHALL BE REPORTED TO THE A/E TEAM FOR DIRECTION. ANY AND ALL WORK <br /> STEEL AROUND 3 SIDES COUNTER SINK REQUIRED TO ACCOMMODATE EXISTING CONDITIONS SHALL BE INCLUDED IN CONTRACTOR'S BID. NO <br /> OF FLOOR SINK UNDER CASE. MIXING ALLOWANCES WILL BE MADE AFTER THE PROJECT HAS BEEN AWARDED FOR FAILURE TO VERIFY <br /> (HAND SINK) VALVE <br /> SECURE TO RIM OF FLOOR EXISTING CONDITIONS. <br /> SINK W/ SILICON CAULKING CEILING <br /> 42FP-TRAP <br /> "x2" NO-HUB REDUCER & 32. ALL EXISTING PIPING, EQUIPMENT, AND ACCESSORIES, WHETHER SHOWN OR NOT, IS TO REMAIN <br /> REQUIRED FOR UNLESS NOTED OTHERWISE. PIPING AND EQUIPMENT TO BE REMOVED IS SHOWN DARK AND <br /> OMBINATION WASTE & DASHED. ANY PIPING AND EQUIPMENT SHOWN LIGHTER AND SOLID IS TO REMAIN. <br /> ENT SYSTEM ONLY. USE MIXING w <br /> VALVE <br /> " " P-TRAP FOR VENTED 120 DEG. F. 0 33. ALL PIPING, EQUIPMENT, AND ACCESSORIES TO BE REMOVED SHALL REMAIN PROPERTY OF THE <br /> 3 P-TRAPIXTURES. CD OWNER OR DISPOSED OF LEGALLY, AS DIRECTED BY THE OWNER. <br /> CV <br /> LAVATORY <br /> (SINGLE) <br /> NOTE: PLUMBING SHEET INDEX <br /> LOCATE MIXING VALVE PER PLANS. TEMPERATURE OF HOT WATER AT FAUCET SHALL NOT <br /> EXCEED 120 DEG. F. PO.1 PLUMBING LEGEND, DETAILS, & GENERAL NOTES <br /> P1.0 PLUMBING WASTE AND VENT PLAN <br /> P2.0 PLUMBING WATER AND GAS PLAN <br /> CASE FLOOR SINK - TYP . SCALE: NTS 1 THERMOSTATIC MIXING VALVE SCALE: NTS 2 <br /> 3'-9„ 74 <br /> 2'-0" 1'-6" 3" <br /> VENT PIPING PER <br /> PIPING SCHEDULE U) <br /> SINK FURNISHED BY ALBERTSONS WITH: w_ <br /> (1) SWING FAUCET, VACUUM BREAKER ROOF MATERIAL MAY VARY, PC TO <br /> Z W <br /> (1) LEVER WASTE WITH OVERFLOW & COORDINATE WITH ROOFING CONTRACTOR. w <br /> TAIL-PIECE IN ORDER TO MAINTAIN ALL ROOFING <br /> WARRANTEES. <br /> 4„ 4„ �/� <br /> NOTE: v <br /> ao VENT PIPING SHALL TERMINATE NOT LESS <br /> REQUIREMENTS: VENT ROOF JACK COORDINATE <br /> A 3/4" HW WALL STOP AT +16 A.F.F. THAN 6" ABOVE ROOF NOR LESS THAN 12" APPROPRIATE MATERIAL WITH <br /> B 3/4" CW WALL STOP AT +16 A.F.F. FROM ANY VERTICAL SURFACE. ROOFING CONTRACTOR. v <br /> (� <br /> FLASH AS REQUIRED <br /> O ROOFING MATERIAL v7� LO <br /> z 7 <br /> LO <br /> N � NOTE: <br /> REFER TO FLOOR PLAN FOR LEFT w <br /> OR RIGHT DRAIN BOARD <br /> CONFIGURATION <br /> r�l <br /> 1" AIR GAP <br /> Q <br /> FLOOR <br /> SINK J 00 <br /> Q <br /> SINGLE DRAIN BOARD PREP SINK TYP . SCALE: NTS 3 VENT THRU ROOF SCALE: NTS 4 PROJECT NUMBER AL21 860 <br /> DRAWN BY: CDP <br /> CHECKED BY: ASB <br /> BUILDING SIZE: 165,715 SF <br /> STORE NUMBER <br /> 2600 <br /> SHEET TITLE <br /> PLUMBING <br /> LEGEND, <br /> DETAILS, & <br /> GENERAL NOTES <br /> SHEET NO. <br /> Pool <br />