My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1101
>
1600 - Food Program
>
PR0543754
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2019 3:25:37 PM
Creation date
12/10/2018 8:37:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543754
PE
1614
FACILITY_ID
FA0024872
FACILITY_NAME
BRUSTER'S REAL ICE CREAM
STREET_NUMBER
1101
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1101 E MARCH LN #N
P_LOCATION
01
QC Status
Approved
Scanner
JCastaneda
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1101\PR0543754\1101 E MARCH-BRUSTERS.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NO. REVISION & DATE <br /> PLUMBING NOTES: <br /> 1 . DRAWINGS INDICATE DIAGRAMMATICALLY THE ARRANGEMENT OF PRINCIPLE APPARATUS, PIPING AND <br /> OTHER MATERIAL. FOLLOW DRAWINGS AS CLOSELY AS POSSIBLE, IN ORDER TO ACHIEVE A NEAT <br /> TO ACHIEVE ARRANGEMENT OF PIPING, AND EQUIPMENT WHILE STILL OVERCOMING OBSERVATION. <br /> 2. ALL PLUMBING VENTS SHALL TERMINATE 12" FROM ANY VERTICAL WALL AND 10' FROM ANY <br /> OUTSIDE AIR INTAKE. <br /> 3. PROVIDE MIN. OF 1/4"/FT. SLOPE AT ALL WASTE PIPING AT 3" PIPE AND SMALLER, PROVIDEM <br /> 1/8"/FOOT SLOPE AT WASTE PIPE 4" AND LARGER. ui m <br /> 4. GAS PIPE SHALL BE SCHEDULE 40 BLACK STEEL, ASTM A120. GAS PIPING BELOW GROUND SHALL <br /> HAVE PROTECTIVE COATING WRAPPED MATERIAL BY MANUFACTURE. GAS PIPINGSHALL BE BURIED 3 O U U <br /> MINIMUM DEPTH OF 24" BELOW GROUND. ABOVE GROUND AT EQUIPMENT HORIZONTAL GAS PIPING <br /> SHALL BE SUPPORTED PER TABLE 12-3, SEE BELOW. U O Q <br /> 5. ALL EQUIPMENT SERVED WITH GAS SHALL HAVE A SHUT-OFF VALVE AND FLEXIBLE CONNECTION <br /> AT UNIT. (E) 10 GAL WATER HEATER ABOVE CEILING w <br /> N W m <br /> 6. ROUTE 3/4" GALVANIZED OR COPPER PIPE DISCHARGE OF P & T RELIEF VALVES FROM WATER FEEDING (E) RESTROOM TO REMAIN AS IS _ <br /> HEATER TO EXTERIOR OF BUILDING. STUB PIPING +6" ABOVE FINISH GRADE AND ELBOW DOWN. o - 0 1 <br /> 7. ROUTE 3/4" CU PIPE FOR CONDENSATE DRAIN FROM A/C TO OUTSIDE OF BLDG. W/ ELBOW DN. 3/4" P.R. TO OUTSIDE �` � 2 <br /> AND 6" A.F.F. \ (E) HOSE BIBS OF BUILDING, TURNED O cel <br /> 8. WATER CLOSET AND ASSOCIATED FLUSHOMETER VALVES SHALL USE NO MORE THAN 1.28 GAL. 1/2"CW DOWN TO 6" A.F.F ❑ <br /> PER FLUSH & SHALL MEET PERFORMANCE STANDARD ESTABLISHED BY THE AMERICAN NATIONAL �I (E)W.C.O. �. O = o o <br /> STANDARDS INSTITUTE STANDARD A112-19-2, H&S CODE SECTION 17921.3(b). (/� 0 T_ <br /> 9. ALL WATER PIPING IS IN ATTIC SPACE U.O.N. FOR UNDERGROUND PIPING. ❑ E 4 HW 3 v , � M co o <br /> 10. ALL PLUMBING SHALL MEET 2016 C.P.C. C µ/� <br /> (E)3„W (E)WC-1 Q a <br /> 11. PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION, ❑ " ❑ w ❑- /i ' \ /1 Lo p cu <br /> ELEVATIONS, AND CHARACTERISTICS OF ALL UTILITIES AND PIPING OF WHICH IS TO CONNECT AND `STORAGE E 3 4"CW \ e (E) 3"VTR (Jof <br /> SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR PROBLEMS. O / I (E) 3/4"CW STORAGE _ / (E)2"W \ <br /> 12. TRAP FOR ALL LAVATORIES AND SINKS SHALL TRAP STRAIGHT BACK TO WALL WITH ALL REQUIRED <br /> OFFSETS WITHIN THE WALL. (N) 74GAL GAS WATER---,, _ (E)3"W <br /> 13. ALL PLUMBING WORK SHALL BE INSTALLED TO AVOID INTERFERENCE WITH ELECTRICAL, ( ) W/ 1"CW,HW, 1 CW / ' I © © - J (E)LAV-1 ( ) <br /> HEATER WH-1 <br /> MECHANICAL EQUIPMENT AND STRUCTURAL FRAMING. 1/2"G SEE DETAIL 7/P.2 & n o :"�❑P.O.C. / (E) 1/2"CW,HW W/H 02 W / <br /> 14. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL CEILING ACCESS PANELS WITH THE 8/P.2 FOR FLUE DUCT -.- J -' <br /> i _ 2'Y FS <br /> ARCHITECTURAL REFLECTED CEILING PLAN AND ELECTRICAL LIGHTING PLAN. - <br /> 15. ALL CLEANOUTS SHALL BE INSTALLED WHERE EASILY ACCESSIBLE. THE CONTRACTOR SHALL2"V <br /> 1/ "CW,HW <br /> COORDINATE ALL CLEAN-OUT LOCATIONS WITH ALL EQUIPMENT, CABINET'S, ETC. PRIOR TO I w E 1"CW W 2 W - t <br /> INSTALLATION. I v S.O.V. IN ATTIC P.O.0I -L - - -i IS <br /> 16. ALL VALVES, UNIONS, ETC. TO BE SAME SIZE AS PIPE UNLESS INDICATED OTHERWISE ON 3/4"C.D. INTO <br /> DRAWINGS. j OFFICE I 3 FLOOR SINK W/ <br /> 17. BEFORE FABRICATION OR INSTALLATION PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATIONSI 1" AIR GAP <br /> OF ALL MECHANICAL EQUIPMENT AND EQUIPMENT PROVIDED UNDER ANOTHER SPECIFICATIONS. <br /> OFFICE I `' <br /> EXACT ROUGH-IN LOCATIONS AND REQUIREMENTS SHALL BE COORDINATED WITH WORK OF OTHER (E) 2"CW (E) 2"CW IN ATTIC <br /> CONSULTANTS AND EQUIPMENT VENDORS DRAWINGS. I IN ATTIC <br /> 18. IF MACHINE SAW CUTTING OF SLAB IS REQUIRED FOR PIPING TO BE INSTALLED BELOW FLOOR. ? <br /> VERIFY EXISTING SLAB CONDITION IN FIELD. I N I I WALK-IN N' „ WALK-IN <br /> 19. ALL VALVES, TRAP PRIMER, WATER HAMMER ARRESTERS OR OTHER EQUIPMENT SHOWN ON WALLS $--J <br /> OR ABOVE NON-ACCESSIBLE CEILINGS SHALL BE INSTALLED BEHIND AN ACCESS PANEL. 3 3 COOLER ❑ <br /> 20. ALL PLUMBING FIXTURES AND EQUIPMENT SHALL BE CERTIFIED BY THE STATE ENERGY i I i COOLER <br /> COMMISSION TO COMPLY WITH EFFICIENCY STANDARDS PER SECTION 2-5314(A) OF THE TITLE-24 (E) 3/4" BRANCH & S.O.V. ® 3 CC <br /> REGULATIONS. (R) A/C TO REMAIN I G <br /> 21 . ALL HOT WATER PIPING (DOMESTIC USE & ABOVE CEILING IN THE PLANT AREA) SHALL BE (E) GAS PIPE UP THRU I (R) A/C W z <br /> I <br /> INSULATED WITH 1" THICK MANVILLE "MICROLOCK" 850-APT SNAP ON FIBERGLASS INSULATION. ROOF TO (R) A/C UNIT I ❑ AT ROOF I ui <br /> 22. PIPING THROUGH FIRE RATED WALL SHALL BE INSTALLED PER U.L. FIRE RESISTANCE SYSTEM NO. <br /> WL1001. REFER TO ARCHITECTURAL DRAWINGS FOR WALL LOCATION. AC <br /> (E) GAS PIPE TO P.O.C. I z U w <br /> 23. CONTRACTOR SHALL COORDINATE ALL PLUMBING REQUIREMENTS WITH KITCHEN EQUIPMENT PRIOR (E) GAS METER & _-�- �-�- 1 ~ C:) <br /> TO BID AND VERIFY POINT OF CONNECTION TO UTILITIES PRIOR TO CONSTRUCTION. FD-1 2"w❑ C " U) N <br /> SERVICE TO REMAIN _ G _V <br /> 24. ALL EQUIPMENT SHALL BE LATERALLY SUPPORTED IN ALL DIRECTIONS TO RESIST 20% OF THE © PREP <br /> EQUIPMENT OPERATING WEIGHT. <br /> 25. PROVIDE THRUST BLOCKS FOR ALL NEW U.G. UTILITIES. 1/2"CW ® +13" A.F.F. AREA I I �i ❑ j - J L0 <br /> 26. PIPING PASSING THROUGH CONCRETE FLOORS SHALL BE ADEQUATELY PROTECTED AGAINST - ❑ N PREP <br /> BREAKAGE PER CPC SEC. 312. " - -""-w ° ° °4 ° AREA ° ° 4 4 ° > UJ = Q <br /> 27. ALL PRESSURED WATER PIPING BELOW FLOOR SHALL BE TYPE "L" SOFT ANNEALED COPPER 1/2"HW +42" A.F.F. ❑ r , U <br /> TUBING WITH NO FITTING BELOW SLAB. t.J <br /> 28. SUSPENDED PIPING SHALL BE PROVIDED WITH LATERAL SWAY BRACING PER S.M.A.C.N.A. TP-1 W/ 1/2" TRAP PRIMER © FD-1 2"w <br /> GUIDELINES FOR SEISMIC CONSTRAINTS. 1/2"CW ® +13" A.F.F. I ------- 6 I ----- U) C z <br /> 29. SHUT OFF WATER VALVES UP TO AND INCLUDING 2' IN SIZE SHALL BE BALL VALVE STAINLESS I G O <br /> STEEL LOCKABLE POSITION. <br /> 30. NO FLEXIBLE PIPING OR CONNECTION SHALL BE APPROVED EXCEPT TO GAS KITCHEN EQUIPMENT. <br /> THESE CONNECTIONS SHALL BE MADE WITH AGA AND UL APPROVED FLEXIBLE APPLIANCE WASH \- <br /> CONNECTORS BY "HOSEMASTER /ASH (f) <br /> 31. THE BUILDING HAS (E) REDUCED PRESSURE BACK FLOW PREVENTER AT WATER SERVICE. AREA 3 3 = r <br /> 32. ALL FLOOR DRAINS SHALL HAVE TRAP PRIMER AS PER PLAN (TP = TRAP PRIMER) ? I 0 --- - AREA W O <br /> LEGEND 4 00 1 z CW,HW Fo-1 4 <br /> 1 <br /> WASTE LINE O_ / 0! <br /> ---- COLD WATER LINE _ _ - <br /> - - <br /> -ev- HOT WATER LINE �� o i <br /> - - - - - VENT LINE 1/2"CW,HW LINE CO <br /> - GAS 1/2"CW,HW `- I ' © �' ❑i © z <br /> (E) EXISTING ®° ? 3 I a <br /> (N) NEW 0 I 3/4"CW,HW D <br /> (R) REPLACED 1 1/2"W <br /> S.O.V. SHUT OF VALVE 2 W FCO rrI� <br /> U.G. UNDER GROUND 0 V <br /> W.C.O. WALL CLEAN our 1/2"cw,Hw o SERVING wco SERVING Z ��� Z <br /> P.O.C. POINT OF CONNECTION AREA ❑ AREA 1C C( m <br /> F.C.O. FLOOR CLEAN OUT <br /> V VENT <br /> CW COLD WATER <br /> V.T.R. VENT TO ROOF a a <br /> HW HOT WATER e e e e a o <br /> C.D. CONDENSATE DRAIN a o 0 <br /> e o e LlVAkAUems. W11 �s ' `75- <br /> Ell ❑ Q�QFESSIONq� <br /> M0 <br /> SALES AREA SALES AREA <br /> ENTRY <br /> ENTRY ya 79.6130120�� <br /> qTF OF CP��� <br /> (E) HOSE BIBB <br /> DATE: 11 -15-17 <br /> 4SHEET NOTES: tih SCALE: AS SHOWN <br /> SHEET NOTES: <br /> 1. FIELD VERIFY (E) WATER PIPING & P.O.C. FOR NEW WATER PIPING. <br /> 1 . FIELD VERIFY (E) WASTE PIPING & P.O.C. FOR NEW WASTE PIPING. DRAWN BY: R. ORTIZ <br /> � `� k. <br /> 2. SEE SHEET P.2 FOR STANDARD DETAILS & NOTES. 2. FOR ALL INDIRECT DRAINS PROVIDE MIN. OF 1" AIR GAP. �. <br /> 3. EXISTING WATER PIPING ® (E) PLUMBING FIXTURES TO REMAIN AS IS. 3. SEE SHEET P.2 FOR STANDARD DETAILS & NOTES. JOB NO: <br /> 4. EXISTING WASTE PIPING ® (E) PLUMBING FIXTURES TO REMAIN AS IS. <br /> SHEET: <br /> PLUMBING PLAN - WATER PIPING 14"=1'0" A PLUMBING PLAN - WASTE PIPING 1/4"=1'0" A P- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.