Laserfiche WebLink
part number is P761C-FLDV. I changed the overfill prevention device from 7150-410C to 7150-420C as this was <br />incorrect. <br />4) P 8 of 8 only lists one sump model, two sumps 42" and 46" are being proposed. I added the second sump model <br />to that application on page 8 to show 2 sumps. <br />5) P 8 of 8 only one UDC size is listed two were proposed before. I added the second UDC model to the application <br />on page 8 to show 2 UDC's. <br />6) On service request please check the correct billing party and please confirm that Chadha Construction will be <br />the owner/operator of these USTs, if not please include the correct owner/operator. I have checked the box <br />stating Chadra Construction is the owner/opertator of the UST's. <br />7) Please provide Fire Flex certification for Les Henderson. The Fire Flex certification for Les Henderson is included <br />in the provided Franklin Fueling Containmet (APT Brand) Certification. The fire <br />8) Need ICC certification for Marcus Garcia. I have attached ICC Certification for Marcus Garcia. <br />9) Please provide a VMI certification for Les Henderson. Les Henderson does not have a VMI Certificaiton. I have <br />attached the B&T Service Station Contractors VMI Certfictiaons. <br />Please don't hesitate to call me if you have any questions. <br />Sincerely, <br />Elena K. Manzo, Lead Sr. REHS, <br />San Joaquin County <br />Environmental Health Department <br />1868 E. Hazelton Ave. <br />Stockton, CA 95205-6232 <br />Voice: (209) 953-7699 <br />From: Rupinder dhillon <todhillon@yahoo.com> <br />Sent: Thursday, July 12, 2018 5:53 PM <br />To: Elena K. Manzo [EH] <emanzo@sjcehd.com> <br />Subject: Re: RE: RE: RE: 1231 N Main Street <br />Ms. Manzo, <br />Thanks for getting back to me. Our project is on hold, we can't do any further work without your approval. So, please let <br />me know, if we have your approval on changing the Fuel contractor. Your help would be appreciated. <br />Thanks, <br />Dhillon <br />On Thursday, July 12, 2018, 3:51:51 PM PDT, Elena K. Manzo [EH] <emanzo6a sicehd.com> wrote: <br />Hi Dhillon <br />I am sorry I missed your visit. Your project is next up on my list for review; I apologize for the delay, we have <br />been inundated with repairs and new installs. I will do my best to review it as soon as possible. Please don't <br />hesitate to call me if you have any questions. <br />Sincerely, <br />