Laserfiche WebLink
Figure 1 -- <br /> Step 15: Install the flange gasket Tape Measured O i Containment <br /> (p/n 566708, supplied). i Manhole <br /> i <br /> A <br /> CONNECT THE A1100 TO THE LOWER DROP TUBE t 4" Riser Pipe <br /> B <br /> Fluid Level <br /> Step 16: Apply a light coat of <br /> sealant to both the A1100 and the Riser Pipe With Spill Containment Manhole <br /> bottom drop tube. Make sure the <br /> O-ring (p/n 480049, supplied) is CO: <- Tape Measure <br /> installed on the A1100 body. Figure 2 p <br /> i <br /> _I 4" Riser Pipe <br /> Manway <br /> L J <br /> �fl y <br /> Max. Fluid <br /> a B Height <br /> t <br /> Riser Pipe Installed On Manway <br /> Step 3: Find Measurement B from the chart below. It is the distance from <br /> the maximum fluid height allowed to the inside top of the tank. Calculations <br /> Step 17: Align the pre-drilled Step 18: Use a sharp blow on are based on cylindrical tanks with flat ends. For exact dimensions, consult <br /> holes of the tube with those of the the indentor tool to form the tube the tank gauge chart provided with your tank. Local requirements may limit <br /> valve. into each countersink on the collar. fill capacity to 95%or 97%. <br /> 95% Shut-off 97% Shut-off <br /> Tank Diameter B Dimension B Dimension <br /> Feet Meters Inches MM Inches MM <br /> 4.0' 1.22 5.0" 127 3.0" 76 <br /> 6.0' 1.83 7.0" 178 4.0" 102 <br /> 6.5' 1.98 7.5" 190 5.4" 136 <br /> 7.0' 2.13 8.0" 203 5.8" 147 <br /> 7.6' 2.29 9.0" 229 6.2" 157 <br /> 8.0' 2.44 9.5" 241 6.5" 168 <br /> 8.2' 2.50 9.5" 241 6.8" 172 <br /> 8.5' 2.59 10.0" 254 7.0" 178 <br /> Step 19: Apply a light coat of sealant to each of the four rivets (p/n 564412) 9.0' 2.74 10.5" 267 7.4" 189 <br /> 9.5' 2.90 11.0" 279 7.8" 199 <br /> and fasten in place. 10.0' 3.05 11.5" 292 8.5" 216 <br /> 12.0' 3.66 14.0" 336 9.5" 241 <br /> 6 3 <br />