Laserfiche WebLink
Step 4: To determine the top tube cut length C, add A and B, then subtract 3". Step 9: Cut tube to proper length using a fine tooth hacksaw. The hose <br /> Top tube cut length, C -A+ B-3" clamp acts as a guide for a straight cut. <br /> Step 10: Remove clamp and template. File away cutting burrs with a fine <br /> tooth file to prevent installation damage to the O-ring seal of the collar. <br /> IMPORTANT: Do not use a power saw or tubing cutter to cut the tube. <br /> OPTIONAL DRILLING METHOD <br /> A special drilling fixture (p/n <br /> 566675) is available which elimi- <br /> Step 5: For valves with gold sleeve, measure length C from the bottom of top nates the paper template, is more <br /> tube. accurate, and reduces assembly <br /> time. <br /> CONNECT THE COLLAR TO THE DROP TUBE <br /> TZME <br /> Step 5: For valves without gold sleeve, measure length C from indicated <br /> mark as shown. <br /> Step 11: Apply a light coat of the Step 12: Slide the collar inside <br /> sealant /n 566726, supplied)to the drop tube and align the four <br /> � (P PP ) P 9 <br /> the outside of the collar and the holes. <br /> inside of the tube. Make sure the <br /> Step 6: Wrap the paper drilling template (p/n 566710, supplied) over the drop O-ring is installed in the groove of <br /> tube and tape in place. Line up cut-off line on template with the cut length C. the collar. <br /> a <br /> �3 <br /> Step 7: Secure with the hose Step 8: Drill four pilot holes 3/32 Step 13: Use a sharp blow on the Step 14: Rivet collar in place <br /> clamp (p/n 564421, supplied)as diameter through the drop tube as indentor tool (p/n 564416, sup- with four rivets (p/n 564412, sup- <br /> indicated on the template. indicated on the template. Redrill plied)to form the tube into each plied). <br /> holes to final size of 13/64 dia. countersink on the collar. <br /> 4 5 <br />