My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 2012 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 2:41:11 PM
Creation date
12/21/2018 3:49:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2017
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for TRACY76 as of August 09, 2017. <br /> Open violations from May 09, 2017 inspection <br /> Violation #103 -Current financial responsibility documents not submitted. <br /> Financial responsibility documents have not been submitted to the EHD. Current financial responsibility documents <br /> are required to be submitted annually. Immediately log into the California Environmental Reporting System (CERS) <br /> at http://cers.calepa.ca.gov/, and upload the required documents. <br /> Violation #104 - UST operating permit application for facility and tank information not submitted or current. <br /> UST Facility Operating Permit Application is lacking a current BOE number is incorrect Immediately log into CERS, <br /> update the required information, and submit for review by the EHD. <br /> UST Tank Information forms for the Diesel,87, and 91 grade tanks are not current in CERS. The three tanks have <br /> a steel primary, with a fiberglass secondary. Under"Tank Construction," the primary containment for each of the <br /> three tanks shall be changed to "steel." Immediately log into CERS, update the required information, and submit for <br /> review by the EHD. <br /> Violation #105 - Failed to have an approved UST monitoring plan. <br /> The monitoring plan is not current and/or not approved by the EHD. The monitoring plan for the diesel tank under <br /> "Vent, Vapor Recovery(VR) and Riser/ Fill Pipe Piping Construction," indicates a vapor recovery primary <br /> containment as fiberglass. The diesel tank does not have a vapor recovery primary containment. This should be <br /> changed to none. The monitoring plan must be uploaded to the California Environmental Reporting System <br /> (CERS). Immediately log into CERS, make the necessary changes, and submit for review by the EHD. <br /> Violation #107 - Plot plan/site map not submitted or failed to completely show where monitoring is <br /> performed. <br /> An accurate UST Monitoring Site Plan was not submitted. A site plan must be submitted identifying the locations <br /> where monitoring will be performed. Immediately log into the California Environmental Reporting System (CERS) at <br /> http://cers.calepa.ca.gov/and upload a copy of the UST Monitoring Site Plan. <br /> Violation#113- Failed to submit monitoring system certification test report within 30 days. <br /> Annual monitoring system certification, leak detector testing, and spill container testing was performed on 5/3/16 <br /> and a test report was submitted on 6/14/16. A copy of the test report must be submitted within 30 days of the tests. <br /> Take all necessary precautions to ensure testing and submittal of test reports are performed in a timely manner. <br /> Violation #121 - Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on 5/3/16 and an inspection report was issued identifying information to be submitted to <br /> bring this site into compliance. This information was required to be submitted by 6/2/16 . This information has not <br /> been received resulting in a non-compliant status for this facility. An operator that receives an inspection report <br /> shall have 30 days to submit a written response that includes a statement documenting corrective actions taken or <br /> proposing corrective actions which will be taken. Ensure that a written response documenting corrective actions <br /> taken or proposed is submitted within 30 days of receiving an inspection report. <br /> Existing violations for the 5/3/16 inspection report include: <br /> 1) 105 - Current BOE number not submitted <br /> 2) 107- Plot plan/site map not submitted on CERS <br /> 3) 110- Failed to submit secondary containment test results <br /> 4) 103 - Current financial responsibility documents not stubmitted <br /> 5) 207 - Designated operator did not inspect all required items and/or the inspection reports not completed <br /> 6) 314 - Primary containment not tight <br /> 7) 125 - Failed to submit a written response in 30 days of receiving an inspection report <br /> 8) 113- Failed to submit monitoring system certification test report within 30days. <br /> Existing violations for the 5/18/15 inspection report include: <br /> 1) 110- Failed to submit secondary test results within 30 days. <br /> 2) 201 - Failed to maintain alarm logs and/or records of follow up actions. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.