My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 9:12:47 AM
Creation date
12/21/2018 4:23:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY 76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax: (209) 468-3433 Web:www.sogov.org/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> TRACY76 1 2420 W GRANT LINE RD TRACY May 22 2018 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II, or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 104 CCR 2711 UST operating permit application for facility and tank information not submitted or current. <br /> UST Facility Operating Permit is not current in CERS. The tank owner is listed as Reliance Gas Investments. <br /> According to previous conversations with Jivtesh Gill, the tank owner is actually Toste Farms. Any change of <br /> information must be updated in CERS within 30 days of the changes. Immediately log into CERS, update the required <br /> information, and submit for review by the EHD. <br /> UST Tank Information forms for the are not current in CERS. <br /> -All three forms incorrectly list the tanks as having fiberglass primary and secondary. The tanks were observed to be <br /> double-walled steel. <br /> -All three forms incorrectly list the product piping primary as steel. The product piping was observed to be <br /> double-walled fiberglass. <br /> Any change of information must be updated in CERS within 30 days of the changes. Immediately log into CERS, <br /> update the required information, and submit for review by the EHD. <br /> This is a repeat violation, Class ll. <br /> 105 CCR 2632(d)(1), 2634(d) Failed to have an approved UST monitoring plan. <br /> The monitoring plans are not current and/or not approved by the EHD. <br /> -The 87 monitoring plan states the leak detector is a VMI LD2000. The leak detector observed is a VMI 99LD2000. <br /> The monitoring plan must be uploaded to the California Environmental Reporting System (CERS). Immediately log <br /> into CERS, make the necessary changes, and submit for review by the EHD. <br /> This is a repeat violation, Class Il. <br /> 107 CCR 2632(d)(1)(C) Plot plan/site map not submitted or failed to completely show where monitoring is performed. <br /> An accurate UST Monitoring Site Plan was not submitted. The map does not include annular sensors and the piping <br /> drawn in does not run to all three tanks. A site plan must be submitted identifying the locations where monitoring will <br /> be performed. Immediately log into the California Environmental Reporting System (CERS) at <br /> http://cers.calepa.ca.gov/and upload a copy of the UST Monitoring Site Plan. <br /> This is a repeat violation, Class II. <br /> 113 CCR 2638(d) Failed to submit monitoring system certification test report within 30 days. <br /> Annual monitoring system certification, leak detector testing, and spill container testing was performed on 5/9/17 and <br /> a test report was submitted on 9/18/17, three months late. A copy of the test report must be submitted within 30 <br /> days of the tests. Take all necessary precautions to ensure testing and submittal of test reports are performed in a <br /> timely manner. <br /> This is a repeat violation, Class ll. <br /> FA0003963 PR0231580 SCO01 05/22/2018 <br /> EHD 23-01 Rev.09/22/16 Page 4 of 6 Underground Storage Tank Program OIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.