Laserfiche WebLink
5 <br /> t " <br /> I IVULEM A,susMEN r s1UMT <br /> INUU0,140 QUAHTEMY MoW o(%NQ MIM <br /> 1399 East YpSemda Avenue,Martlaca.Cnide,nia <br /> .�. The site lies approximately 41 feet above mean sea level (MSL.). 'topographic relief at the site <br /> is minimal;the ground surface slopes gently to the southwest. The site is paved with asphalt, <br /> except in the area of the pump islands and the USts, where the surface is concrete. <br /> Six wells (domestic, municipal, and irrigation) are located within a 1-mile-radius of the site. <br /> A discussion of the wells and their locations is presented in a report by a previous consultant <br /> �. (Delta, 1939). <br /> 2.2 Rdlacent land Uses <br /> The site is located in a commercial area of eastern Manteca. The property is bounded on the <br /> north by a small shopping center, on the west by a fast food restaurant, on the south by East <br /> Yosemite Avenue and on the east by Northwoods Drive. <br /> 2.3 Spill and Investigation History <br /> There has been no documented release of petroleum hydrocarbons at the site. Observation <br /> of the former USTs during an epoxy-lining procedure in 1985 indicated that no holes were <br /> present. <br /> 2.4 Previous Investigations <br /> w Aegis assumed responsibility for the site investigation in January 1991. Work performed at <br /> the site by previous consultants included investigations by ETS, Delta, and NGA. The results <br /> Of laboratory analysia of soil and groundwater from these investigations are summarized in <br /> a Table 2 (Analytical Results: Soil Borings), Table 3 (Analytical Results: Groundwater), and <br /> Table 4 (Analytical Results: Soil Samples and Soil Borings During Tank Excavation). The <br /> laboratory reports are included in Appendix C. <br /> 2.4.1 Earth Treatment Systems <br /> Four soil borings (SB-1 through SB-4)were drilled by ETS in August 1988. Soil boring SB-4 <br /> was converted to a monitoring well (MW-1). SB-1 was drilled to a total depth of 23 feet, SB-2 <br /> to a depth of 25 feet, and SB-3 to a depth of 10 feet. MW-1 was completes' as a 2-inch- <br /> diameter well to an approximate depth of 361h feet. Approximate locations of the soil borings <br /> and the monitoring well are shown on Figure 2. <br /> 10, 15, and 20 feet in SB-1, SB-2, and MW-1. A <br /> Samples were obtained at depths of 5, <br /> 10-foot sample was collected from SB-3. Soil samples from the borings were analyzed for <br /> BTEX, EDC, EDB, and TPH, as gasoline. Toluene ranged from 0.006 to 0.013 ppm in SB-1 <br /> and from 0.006 to 0.064 ppm in SB-2. Maximum concentrations of BTEX and TPH in the soil. <br /> samples from MW-1 were 0.05, 0.03, 0.42, 1.6, and 28 ppm, respectively (Table 2). <br /> 3 <br /> F � <br />