Laserfiche WebLink
'!wn,NAMUR <br /> p c.- 5 r'• ter` 1 '=' - "..a <br /> 7 <br /> i <br /> PROBLEM ASSESSMENT REPORT <br /> Moa re Petroleum, Inc. <br /> 1399 E. Yosemite Avenue, Manteca, CA <br /> Nr,A Project No. 10-90-480 <br /> Page 3 <br /> TABLE 1 <br /> Tank Information <br /> size Product Storee A�f� Status <br /> 10,000 gallons Regular gasoline 18-20 years Removed <br /> 10,000 gallons Unleaded gasoline 18-20 year.. Removed <br /> 10,000 gallons Premium Unleaded gasoline 18-20 years Removed J, <br /> 1,000 gallons Waste oil 18•-20 years Operating f <br /> 10,000 Premium Unleaded gasoline < 1 year Operating <br /> 10,000 Regular Unleaded gasoline < 1 year operating <br /> 8,000 Regular gasoline < 1 year operating <br /> 2.2 Summary of Previous Work <br /> Previous work perfcrmed at the site includes investigations <br /> performed by Earth Treatment Systems Environmental (ETS) in August, <br /> 1988, and Delta Environmental Consultants, Inc. (Delta) in May and <br /> September, 1989. Work ccmpleted by ETS included the drilling of <br /> four soil borings, installation of one monitoring well, and the <br /> collection of soil and ground-water samples from the soil borings <br /> and monitoring well. Results of the work performed by ETS was <br /> submitted in a report titled Environmental Preliminary Site <br /> Assessment. <br /> Work completed by Delta at the site in May, 1989, included the <br /> drilling of two soil. borings, completion o` two monitoring wells <br /> (MW-2 and MW-3) , collection of soil and ground-water samples for <br /> laboratory analysis, determination of the direction and velocity <br /> of ground-water flow, and the issuance of a report titled <br /> preliminar I3 dra sola is Assessment Re ort. In September, 1989, <br /> Delta representatives collected soil samples from beneath USTs at <br /> the site and supervised the installation of the below-ground <br /> components of a soil venting system. Resultsof this work by <br /> Delta, which has not been reported elsewhere, and more recent <br /> activities at the sive completed by NGA will be reported in the <br /> following sections. <br />