Laserfiche WebLink
2.4.2.The bottom of the anchor points must be 15 inches above the 2.5.2.Clean debris from the top of the tank rib marked with the <br /> top of the slab and positioned the distance from the tank centedine arrowhead symbols ►t. <br /> that is shown in TABLE 2-1 2.5.3. Lift the strap with the hook end down and the hook facing <br /> Note:The straps provided will not work unless the proper ele- away from the tank.(See FIGURE 2-4.) <br /> vation for anchor points is maintained. <br /> GaNanimd strap. Almium Galvanized <br /> Nominal Tank Diameter Nominal distance between erdmnnnemar I/empguide ffimph <br /> tank centerline and anchor <br /> point(and tolerance) <br /> 8. 55"(±3 inches) m1suap <br /> 10, 72"(±3 inches) <br /> TABLE 2-1 FIGURE 2-4 <br /> 2.5.4. Lower the hook end of the strap between the tank and the <br /> 2.4.3.Place 12 inches of level backfill over the slab. anchor point,and hook the strap to the anchor point. <br /> 2.4.4.When setting the tank, make sure that the marked arrowhead 2.5.5. On one end of the threaded rod,put a washer and a blind nut <br /> symbols►t on the tank are aligned with the anchor points on the (acom nut). <br /> anchor slab. 2.5.6.Feed the rod through the hole in the strap-end connector. (See <br /> 2.5.Installing Man-Out-Of-Hale Straps FIGURE 2-5.) <br /> 2.5.1. Each load binder assembly consist of the items shown in 2.5.7.On the other end of the threaded rod,put a washer and a nut. <br /> FIGURE 2-3 and TABLE 2-2. 2.5.8.Center the wear plate on the top center line of the marked ribs. <br /> 2.5.9.Lower the threaded rod,washer and nut into the channel section <br /> on the strap-end connector,taking care to place the washer and nut on <br /> 5�3 3 4 2 1 the outside of the connector.(See FIGURE 2.5.) <br /> 2 4 3 3 5 <br /> 1 <br /> Add blind nut and <br /> washer here <br /> Add nut and washer here <br /> s <br /> Note:The numbers above correlate to item numbers in TABLE 2-2. <br /> FIGURE 2.5 <br /> FIGURE 2-3 2.5.10. Hand-tighten the nuts. <br /> 2.5.11.Repeat POINTS 2.5.5,2.5.6, 2.5.7,2.5.9 and 2.5.10 for the <br /> Load Binder Assembly Parts List second rod of the assembly. <br /> 2.5.12.After the two threaded rods are placed,tighten the threaded rods, <br /> hem Quantity Description using a torque wrench to tighten to 25.30 foot-pounds,or unfit snug. <br /> 2.5.13.Repeat POINTS 2.5.2 to 2.5.12 for each of the load binder <br /> 1 2 MOH Hold-down strap assemblies. <br /> 2 2 518"-diameter threaded rod 0 CAUTION <br /> 3 4 518"washer When tightening straps,do not cause deflection of more <br /> 4 2 5/8"nuts than 3116-inch to the tank diameter. <br /> 2.5.14.Tank deflection should be checked by taking the tank diame- <br /> 5 2 5/8"blind nuts(atom nuts) ter before and after tightening straps as explained in the Deflection <br /> 6 1 Wear plate Measurement Section of the Installation Manual. <br /> 2.5.15.All exposed metal on the anchoring system must be coated <br /> TABLE 2.2 with a corrosion-protection material. Previously coated metal that <br /> has been damaged must be recoated. <br /> Note:Some contractors prefer to perform Points 2.5.5 through 2.5.7 <br /> 2.5.16.Continue installing the tank according to the Installation Manual. <br /> outside the tank excavation before moving the strap to the tank. <br />