Laserfiche WebLink
ZiGETTLEURYAN INC. JAN 20 2019 GR Job# 1820. 0072 <br /> D. Results of Testing/Servicing SWRCB,January 2006 <br /> Software Version Installed: 3 3 0 . 01 <br /> Complete the following checklist: <br /> ® yes ❑ o Is the audible alarm operational? <br /> 0 Yes ❑ No' Is the visual alarm operational? <br /> 0 Yes ❑ No' Were all sensors visually Inspected,functionally tested,and confirmed operational? <br /> 0 Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> Q Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communication equipment(e.g.modem)operational? <br /> ❑ N/A <br /> El Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ❑ N/A detects a leak,fails to operate,or Is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check all that apply) <br /> ❑ Sumpfrrench Sensor, ❑ Dispenser Containment Sensor.Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? Yes, ❑ No. <br /> Q Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> ❑ N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If so,at what percent <br /> of tank capacity does the alarm trigger? 90 <br /> 0 Yes ❑ No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes ❑ No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) ❑product; []Water. If <br /> yes,describe causes in Section E,below. <br /> 0 Yes ❑ No* Was monitoring system set-up reviewed to insure proper settings?Attach set-up reports,if applicable. <br /> Yes I❑ No' I Is all monitoring equipment operational per manufacture's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Dispenser 3/4 794390-208 sensor failed . Changed out sensor; tested and <br /> passed. <br /> Site is equipped with 794380-304 Veeder Root sensor in secondary <br /> annular spaces (Tested all High and Low alarms) , Site is also equipped <br /> with a Veeder Root model#794380-208 in the Vent sump, All sensor test <br /> and confirmed operational . <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 <br />