My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:44:33 AM
Creation date
1/25/2019 1:53:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'A'N 2� 2r?1n <br /> ig <br /> GErTLER-RYAN luc. J GR Job# 1820- 0072 <br /> SWRCB,January 2006 <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed it in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist <br /> Yes ❑ o Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes [3 No' Were ail tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes ❑ No' Was accuracy of system products level readings tested? <br /> 0 Yes ❑ No* Was accuracy of system water level readings tested? <br /> EI Yes ❑ No' Were all probes reinstalled properly? <br /> 10 Yes No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist <br /> Yes ❑ o or equipment start-up or ann5al equipment certification,was a leak simulated verity performance, (check ail <br /> ❑ N/A that apply)Simulated leak rate: ❑ 3 g.p.h. ❑ 0.1 g.p.h. [] 0.2 g.p.h. <br /> Yes No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes ❑ No' Was the testing apparatus property calibrated? <br /> ❑ Yes ❑ No' For Mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> 0 N/A <br /> 0 Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> 0 Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑ N/A Disconnected? <br /> 0 Yes [J_7-0'-- or electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑ N/A fails a test? <br /> 0 Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 1 11 N/A <br /> 0 Yes I ❑ No' were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Comments: <br /> Monitoring System certification Page 3 of 4 12107 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.