Laserfiche WebLink
I <br /> CONSTRUCTION DESIGN CONSULTANTS 209-481-7010 Sept21, 2018 <br /> To: Maribel Flohrschutz <br /> From: Bernice P. Nickols <br /> Subject: Poppy Coffee <br /> 1. Kitchen/serving floors: Epoxy with% inch cove finished to 6" above floor. <br /> 2. Storage room: Washable enamel paint Pe v- Ow ne r_ Jrc� C 3 o-�5 a- mcl <br /> 3. Restroom ceiling:vinyl covered sheetrock panels <br /> 4. One floor sink exists under three compartment sink. Contractor will plumb through existing wall <br /> for floor sink under ice maker. <br /> 5. The 3 compartment sink shall have dual drain boards. <br /> 6. Re: hand sinks,the submitted list of appliances and fixtures show splash guards at hand sinks. <br /> 7. There will be no griddle. No hood required. O <br /> c0rF "' s - t�( (d r dai-,e- - (0 600"14 <br /> 8. The tank-less water heater is EMAX PRO18240 for 18KW, 2 gallons per minute. 61 degree rise, e A.�trtr <br /> electric. An existing gas water heater exists for the restroom sink and is located in the attic. <br /> 9. The sandwich board does not have a sink. A wall mounted hand sink is located within reach. Per-r 0 Lv )-,4r'k- <br /> w I <br /> wi U, !-n_,P_46_�e_. S -�.� d w�`c/-I - ru.e u s IL/\' . <br /> Thanks for thb thorough review! <br /> Bernice <br />