My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AURORA
>
1207
>
3500 - Local Oversight Program
>
PR0543429
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 7:00:13 PM
Creation date
1/31/2019 2:28:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543429
PE
3528
FACILITY_ID
FA0005340
FACILITY_NAME
J C TRUCKING
STREET_NUMBER
1207
Direction
S
STREET_NAME
AURORA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14734404
CURRENT_STATUS
02
SITE_LOCATION
1207 S AURORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ire r ti <br /> operation and maintenance (O&M) costs for this technology are low relative to <br /> O&M costs for other remedial technologies. <br /> Similar to biodegradation augmentation, there are no empirical pilot test <br /> g p p s to <br /> evaluate the effectiveness of ozone injection. Actual field tests must be <br /> conducted and evaluated over a period of approximately one to two months. <br /> Given the documented high success rates and fairly rapid contaminant <br /> r degradation of this method, this treatment option is proposed to be evaluated. <br /> I <br /> Natural Biodegradation. <br /> At some point, most treatment systems reach asymptotic levels, whereby <br /> continued operation results in very little, if any, remediation. At this point, the cost <br /> of remediation is no longer commensurate with,the benefits achieved. When <br /> asymptotic levels become apparent, active remediation is typically terminated, and <br /> natural biodegradation specified to accomplish subsequent remediation. <br /> Past-remediation monitoring is generally conducted to monitor and evaluate <br /> natural biodegradation. Following adequate post-remediation monitoring, "low- <br /> risk" site-closure can oftentimes be considered. Natural biodegradation will be <br /> pursued for this site following sufficient operation of an "active"treatment system. <br /> 4.0 EVALUATION OF REMEDIAL OPTIONS <br /> In general, five treatment options appear to be applicable to the JC Trucking site. Three <br /> of the five options are "active", in other words, they consist of a system which actively <br /> operates (and thus requires system O&M). The five remedial options are evaluated <br /> below in Table 1. <br /> j � <br /> i <br /> E 1 <br /> i <br /> JJW GEOSCIENCES Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.