Laserfiche WebLink
APSA Inspection <br /> December 5, 2018 <br /> inspectors. Testing and inspections conform to manufacturer's <br /> recommendations and API standards. The tank inspection program manager <br /> maintains the tank formal testing and inspection schedule which is discussed <br /> with the terminal operations groups on a bi-weekly basis. The upcoming update <br /> to the SPCC plan will include discussion on the tank inspection and testing <br /> program and personnel qualifications. The update to the SPCC plan is expected <br /> to be completed by March 2019. <br /> Provided in Attachment 1 as a sample of the available reports are the latest <br /> annual visual tank inspections conducted by terminal operators. Additional <br /> inspection and testing reports are accessible at the terminal and the Tesoro <br /> Logistics' division headquarters in La Palma, CA and can be provided separately. <br />