My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
6540
>
2900 - Site Mitigation Program
>
PR0544085
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 11:23:00 AM
Creation date
2/1/2019 10:36:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544085
PE
2965
FACILITY_ID
FA0012627
FACILITY_NAME
BNSF STOCKTON INTERMODAL FACILITY
STREET_NUMBER
6540
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18109023
CURRENT_STATUS
01
SITE_LOCATION
6540 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING, ROGRAM 00- -2- <br /> CLASS II SURFACE IMPOUNDMENT <br /> THE BURLINGTON NORTHER AND SANTA FE RAILWAY CO . <br /> STOCKTON INTERMODAL FACILITY <br /> SAN JOAQUIN COUNTY <br /> c . Annual Monitoring Summary Report <br /> The Discharger shall submit the Annual Monitoring Summary Report to the Board by 15 January <br /> each year. <br /> d. Constituents- of- Concern (COC) 5-Year Report <br /> The Discharger shall submit reports of the results of groundwater monitoring for the Constituents of <br /> Concern every five years , or more frequently if required . The initial COC Report is due at the end <br /> of the first full quarter of facility operation. The succeeding groundwater monitoring for COC <br /> Report shall alternate between the Fall and Spring seasons . The COC Report may be combined <br /> with a Detection Monitoring Report or an Annual Summary Report having a Reporting Period that <br /> ends at the same time . <br /> C . STANDARD OBSERVATIONS <br /> Each monitoring report shall include a summary and certification of completion of all Standard <br /> Observations for the surface impoundments , for the perimeter of the surface impoundments , and for the <br /> receiving waters . The standard observations shall be performed on a weekly basis and shall include <br /> those elements as defined in the Standard Provisions and Reporting Requirements . <br /> D . MONITORING <br /> If the Discharger, through a detection monitoring program , or the Board finds that there is measurably <br /> significant evidence of a release from a surface impoundment or waste constituents over the water quality <br /> protection standards at or beyond the Points of Compliance, the Discharger shall notify the Board or <br /> acknowledge the Board's finding in writing within seven days , and shall immediately resample for the <br /> constituent(s) or parameter(s) at the point where the standard was exceeded. Within 90 days, the <br /> Discharger shall submit to the Board the results of the resampling and either: <br /> a. a report demonstrating that the water quality protection standard was not, in fact, exceeded; or <br /> bo an amended Report of Waste Discharge for the establishment of a evaluation monitoring program, <br /> per Section 20425 of Title 27, which is designed to assess the nature and extent of the release from <br /> the unit and to design a corrective action program meeting the requirements of Section 20430 . <br /> If the Discharger, through an evaluation monitoring program, or the Board verifies that water quality <br /> protection standards have been exceeded at or beyond the Points of Compliance, the Discharger shall <br /> notify the Board or acknowledge the Board' s finding in writing within seven days . Within 180 days , the <br /> Discharger shall submit to the Board an amended Report of Waste Discharge for the establishment of a <br /> corrective action program , per Section 20420 of Title 27 , which is designed to achieve compliance with <br /> the water quality protection standards . <br /> E . REQUIRED MONITORING PROGRAMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.