My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
6540
>
2900 - Site Mitigation Program
>
PR0544085
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 11:23:00 AM
Creation date
2/1/2019 10:36:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544085
PE
2965
FACILITY_ID
FA0012627
FACILITY_NAME
BNSF STOCKTON INTERMODAL FACILITY
STREET_NUMBER
6540
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18109023
CURRENT_STATUS
01
SITE_LOCATION
6540 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING eROGRAM 00- -4- <br /> CLASS II SURFACE IMPOUNDMENT <br /> THE BURLINGTON NORTHER AND SANTA FE RAILWAY CO . <br /> STOCKTON INTERMODAL FACILITY <br /> SAN JOAQUIN COUNTY <br /> the groundwater monitoring network will consists of one upgradient background monitoring well and <br /> two monitoring wells located at the downgradient edge of the surface impoundment and one monitoring <br /> well located downgradient from the oil water separator. Board staff must approve monitoring well <br /> location and construction details prior to well installation. <br /> Groundwater elevation shall be measured quarterly in all monitoring wells at the facility. Groundwater <br /> elevations shall be plotted to produce a groundwater contour map . <br /> Each monitoring well shall be purged three times its well volume or until dry prior to sampling. Metal <br /> analysis shall be reported as dissolved (filter) . The Discharger is required to perform sampling, analysis , <br /> and observations according to the schedule in Table 3 . <br /> Table 3 - Groundwater Monitoring <br /> Parameters Units FrequencX <br /> Field Parameter <br /> Groundwater Elevation Ft. , & hundredths , MSL Quarterly <br /> Temperature °C Semi-Annually <br /> Specific Conductance umhos/cm Semi-Annually <br /> pH pH number Semi-Annually <br /> Monitoring Parameters <br /> mg/L Semi-Annually <br /> Total Dissolved Solids mg/L Semi-Annually <br /> Chemical Oxygen Demand mg/L Semi-Annually <br /> TPH-diesel mg/L Semi-Annually <br /> TPH-oil & grease ug/L Semi-Annually <br /> Volatile Organic Compounds <br /> (EPA Method 8260, see Attachment C) mg/L Semi-Annually <br /> Chloride mg/L Semi-Annually <br /> Sulfate mg/L Semi-Annually <br /> Nitrate - Nitrogen mg/L Semi-Annually <br /> Dissolved Metals (Barium, Copper, Lead, mg/L Semi-Annually <br /> & Zinc) <br /> 4 . Vadose Zone Monitoring <br /> The. vadose zone monitoring system (VZMS) consists of a geonet drainage layer under the entire area of <br /> the surface impoundment . The VZMS sump shall be inspected quarterly for leachate . In any quarter in <br /> which leachate is detected in the VZMS sump grab samples shall be collected and analyzed for the <br /> parameters in Table 4 . <br /> i <br /> 'I <br />
The URL can be used to link to this page
Your browser does not support the video tag.