Laserfiche WebLink
t IN0 . 2u�i+ ..5 +v5 lV1ar 2 , 92 8 : '24 NO - 0O: F .04 <br /> Soil Re-excavation/Resample/Remediation Work Plan <br /> u <br /> at 2102 E. Charter Way, Stockton, CA <br /> March 2, 192- Page 3 of-3— . - _ _ _ — — _ _ <br /> u <br /> Health Services/Environmental Health Divison representative. All <br /> samples will be analyzed for TPH-G and B,T,E and X to LUFT require- <br /> ments. Sampling protocol is outlined 6n sheet attached. <br /> The second phase of this project is actual soil remediation or <br /> disposal . After the excavation is completed and actual amount of <br /> spoil is determined. The best method of soil remediation can be <br /> determined. Several factors play major roles in deciding which <br /> method of treatment is the most efficient and economical . <br /> Final backfill of the excavation will ,be completed upon approval <br /> of the San Joaquin Health Services/Environmental Health Division and <br /> Wm. Hunter and Associates. Backfilling can be accomplished with <br /> either a self compacting material. or compaction of a suitable soil , <br /> loam, or sandy material . If the latter is chosen, an engineered <br /> compaction report will be submitted as soon as it is made available <br /> to us by the engineering firm. <br /> 7. Timing: Excavation and sampling could be scheduled within two weeks <br /> following your review of this work plan. The sample analyses should <br /> be ready for your review within two weeks after they have been taken. <br /> JIM THORPE OIL, INC. <br /> dba RICH-MART CONSTRUCTION <br /> Ric ard. Thorp <br /> President <br /> y <br /> v <br />