Laserfiche WebLink
Ruvalcaba, Cesar <br /> From: Martin Jeppeson <martin.jeppeson@calamco.com> <br /> Sent: Monday,September 16,2019 9:26 AM <br /> To: Ruvalcaba,Cesar <br /> Subject: Re: 2019 SPCC PLAN DRAFT- PR0528393 <br /> Attachments: SPCC p5 fill prevention.pdf <br /> Here is p5 - will schedule tank inspection today per your guidance- will advise of date when I have it. <br /> Martin <br /> Martin Jeppeson,CSP, ARM <br /> Director of Regulatory Affairs <br /> CALAMCO <br /> (209)952-1000 <br /> "Too often we enjoy the comfort of opinion without the discomfort of thought." <br /> --John F. Kennedy <br /> On Mon, Sep 16, 2019 at 9:02 AM Ruvalcaba,Cesar<cruvalcaba@sjgov.org>wrote: <br /> Good morning Martin, <br /> The latest return to compliance for the APSA program has been reviewed. None of the violations could be closed. <br /> Below is an explanation as to why the violations could not be closed. <br /> Violation#710-Plan failed to adequately discuss procedures to test or inspect each container for integrity <br /> The provided inspection reports do not meet the requirements of the Steel Tank Institute's(STI)SP-001 standard, <br /> which is the standard referenced in the SPCC plan. Per the SP-001 standard,here are the qualifications of a Certified <br /> Inspector. <br /> 4.2 Certified Inspector Qualifications <br /> 4.2.1 FEI and FII are to be performed by a Certified Inspector. (FEI =Formal External Inspection FII=Formal <br /> Internal Inspection) <br /> 4.2.2 A Certified Inspector shall be certified by one or more of the following(Additional certifications may be <br /> required by individual states or other governing bodies.): <br /> 4.2.2.1 American Petroleum Institute(API)Standard 653 Authorized Inspector Certification with STI <br /> SP001 Adjunct Certification. <br /> 4.2.2.2 Steel Tank Institute(STI) Certified SP001 AST Tank System Inspector. <br /> 1 <br />