My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
501
>
2900 - Site Mitigation Program
>
PR0515006
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 4:24:39 PM
Creation date
2/1/2019 4:18:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515006
PE
2950
FACILITY_ID
FA0012004
FACILITY_NAME
FONZIA CORPORATION
STREET_NUMBER
501
STREET_NAME
ACACIA
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
501 ACACIA ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v Clayton <br /> ENVIRONMENTAL <br /> CONSULTANTS <br /> 6.5 PERSONNEL DECONTAMINATION <br /> When leaving the work restricted zone, all personnel will decontaminate at the <br /> decontamination station. Decontamination will consist of the following basic steps: <br /> Step 1- Wash and rinse boots in Alconoi" and water <br /> Step 2- Remove outer gloves; discard into waste container <br /> Step 3- Remove outer garment (Tyveks, Saranei", etc.); discard into waste container <br /> Step 4- Remove hard hat, wash, rinse, and hang to dry <br /> Step 6- Remove respirator <br /> Step 5- Remove inner gloves; discard into waste container <br /> Step 7- Wash hands, neck, and face. <br /> Step S- At the end of the shift, wash respirator thoroughly in wash solution, germicidal <br /> rinse, clean rinse, and hang to dry. <br /> 6.6 EQUIPMENT DECONTAMINATION <br /> Clayton's geologist, Mr. Richard Silva, will instruct the drilling company to prepare a <br /> decontamination area for cleaning drilling equipment and sampling tools before drilling <br /> each borehole. The drilling company will steam-clean the drilling equipment (augers, <br /> split-spoons, and other equipment) in the decontamination area before drilling each <br /> borehole. <br /> Under Clayton's supervision, the drilling company will decontaminate the split-spoons <br /> before extracting a soil sample from a borehole to minimize the possibility of cross- <br /> contamination between samples. Clayton's geologist will decontaminate other <br /> sampling equipment such a bailers, hand augers, and trowels. During soil and <br /> groundwater sampling, decontamination of sampling equipment (bailers, split-spoons, <br /> hand augers, and trowels) will be conducted in the following order: <br /> (1) Washing and scrubbing with non-phosphate detergent <br /> (2) Rinsing with water <br /> (3) Second rinsing with deionized water <br /> (4) Air drying <br /> 7.4 ELECTRICAL HAZARDS <br /> Overhead power lines, underground power cables, and electrical equipment may pose <br /> shock, electrocution, or fire if contacted or severed during site activities. <br /> Underground utilities will be marked prior to drilling. <br /> Operations adjacent to overhead lines are prohibited unless one of the following <br /> conditions is satisfied: <br /> * Lockoutltagout procedure. The main electrical switches is in a locked 'off' position <br /> for any electrically operated equipment or electrical lines. Deenergized equipment <br /> or circuits are tagged attached at all points where such equipment or circuits can be <br /> energized. <br /> 5 <br /> ENG147952-KMP <br />
The URL can be used to link to this page
Your browser does not support the video tag.