My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2900 - Site Mitigation Program
>
PR0526345
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 3:57:12 PM
Creation date
2/5/2019 3:45:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526345
PE
2957
FACILITY_ID
FA0017827
FACILITY_NAME
FLAG CITY SHELL
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Mike Infurna [EH] <br /> To: Jennifer Worsley <br /> Subject: RE: New West <br /> Permit SR#0044791 for EW-4 & 5 is issued. <br /> ok for weds, 11-30 start. Go ahead and start the drilling if you're able before I get there. I'll be onsite around <br /> loam. <br /> also, <br /> 1-Jim Barton will be writing the WDR permit for injection of treated gw since Flag City will not take the effluent due <br /> to quantity concerns. you may want to talk to him see if you should strart planning injection well locations/work <br /> plan, and if GWE wells locations/numbers are adequate. Do you plan to test the GWE soon after EW-4 & 5 are <br /> installed? <br /> 2-Geotracker does NOT have your X-Y for the monitoring and three extraction wells already installed. Take <br /> steps now to submit all x-y data you have. <br /> -----Original Message----- <br /> From: Jennifer Worsley [mailto:jennifer@apexenvirotech.com] <br /> Sent: Tuesday, November 22, 2005 4:49 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: New West <br /> Since this is such a high priority site, as you have said yourself, I would hope that you could accommodate <br /> with the permits. With you scheduling and approving drilling yourself, during our last well installs(MW-5 <br /> and MW-6), before Apex had the permits in to you, I figured this would have been plenty of time this go <br /> around for you to approve the permits. Let me know if this procedure has changed for this phase of the <br /> project, since getting the rest of the EW wells installed is a priority to progress on the system installation. I <br /> was being proactive as possible to get the EW's in by letting you know we had the drilling scheduled and <br /> that you would be getting the permits in a day or so; and with your quick permit approval response before, I <br /> didn't see this as a problem. <br /> I have attached a rough schedule for the system installation, weather permitting and if everything goes <br /> smoothly with permitting and trenching. We are planning on discharging to a storm drain inlet which is <br /> located onsite and we should be able to discharge soon after having the system installed. <br /> As for taking over wells from Chevron, it looks like we would be interested in wells MW-19 and MW-20. <br /> Jennifer <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Tuesday, November 22, 2005 11:17 AM <br /> To: Jennifer Worsley <br /> Subject: RE: New West <br /> I cannot accept an appointment for drilling when the permit hasn't been issued, let alone received. I'm <br /> scheduled for drills thru 12-2-05 on sites with permits already issued. Assuming there's no problem with <br /> your application and forms, I will issue the permit first chance I get. I will advise you of the status. Plan on <br /> drilling sometime soon after 12-2 if I can not find someone to cover for me, assuming your permit is issued <br /> in time to start 11-30.. <br /> additionally, please update me with your construction plans for the remediation complex, the ability to use <br /> County water treatment area for your discharge and/or Colani's irrigation ditch, the chances of <br /> 11/28/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.