Laserfiche WebLink
. Page 2 of 2 <br /> Mike, <br /> Per the direction of Laurie Cotulla, R.E.H.S., please contact Sandy Crane at PG&E (209) <br /> 942-1491 to explain the urgency of expediting our request for power installation at the subject <br /> site. Gary Gibson (Apex)submitted the application on 10-27-05; on 11-8-05 Gary was told it <br /> would be 4-5 weeks until the application was reviewed by PG&E engineering staff; and <br /> typically 3-4 additional weeks before power would likely be available. Apex should have the <br /> system installation completed before December 30, 2005. 1 requested maybe some <br /> persuasion from Environmental Health may expedite the service process. <br /> If you have any questions, please contact Gary Gibson directly at (916)240-2849. <br /> Thank you. <br /> Jon Orick <br /> Remediation Project Manager <br /> Apex Envirotech, Inc. <br /> 11244 Pyrites Way <br /> Gold River, California 95670 <br /> (916)851-0174 <br /> (916)851-0177 (fax) <br /> jorick@apexenvirotech.com <br /> 11/14/2005 <br />