Laserfiche WebLink
* <br /> • New West Meeting Notes <br /> 08 November 2005 <br /> EHD office, P Mr. <br /> Attending: <br /> Nuel Henderson, Laurie Cotulla—EHD; Jim Barton—CVRWQCB; Jennifer Worsley, <br /> Michael Sgourakis, Tom Landwehr, Jon Orick—Apex; and Gil Moore—Owner, RP. <br /> Gil started out recounting history of discovery near his site and proactive actions to date: <br /> hired consultants, installed wells, applied to cleanup fund (LUST). Gil had conducted a <br /> pre-purchase site investigation in 1996—site was clean. Gil wants clear communications, <br /> especially directives, to facilitate reimbursements and minimize wasted time. Wanted <br /> directive for enhanced leak detection test (ELD) for fund reasons. <br /> Jennifer noted that the ELD test had been proposed in the last work plan but had not been <br /> commented on. Gil wants to find leak, if present, prior to initiating cleanup. Test has <br /> already been scheduled for after Thanksgiving, but wants the directive issued. <br /> Michael S. estimated that 1500 pounds of MTBE were in the dissolved phase. Yikes! <br /> Wells to be sampled tomorrow for NPDES permit application. Permit application will be <br /> submitted <br /> Plans for power equipment in to PG&E; will require approx 5 weeks for technical review <br /> and another few weeks to issue ok, may be limiting factor for initiating interim <br /> remediation. APEX desires EHD and/or `State' assistance to facilitate PG&E approval <br /> and installation. Apparently has Ron Rowes verbal ok for disposing to the county <br /> treatment system <br /> Jennifer desires directive concerning sampling frequency of MW-4 A&B; currently <br /> weekly,but approaching last week in schedule; go to monthly or quarterly? <br /> APEX desires to monitor their site concurrently with the Chevron site. Jim noted that the <br /> Chevron site is near closure and monitoring may be suspended now; will check on it, <br /> doesn't believe a 4`h QM is scheduled. Jim will reevaluate need for a 4`h quarter event. <br /> EHD recommended installation of wells in all hydrological units to protect CSA wells; <br /> also stressed priority for getting into interim remediation to reduce mass as rapidly as <br /> possible. <br /> Gil (RP)not convinced that plume or all of plume is his; EHD noted that his consultants <br /> can review all data and prepare SCM for all three known impacted sites and present their <br /> interpretations on the issue. <br /> Summary: <br /> • • EHD to respond by letter to proposed ELD test in previously submitted WP; <br /> l <br />