Laserfiche WebLink
f <br /> Ms. Lisa Tuck 9 - 2 - 17 November 2000 <br /> We also require in the annual report both the final expected date each cleanup activity will be <br /> completed (e.g., soil vapor extraction, groundwater extraction, soil excavation in a particular area, <br /> etc.), and the expected date when groundwater cleanup goals will be met, or when cleanup is no <br /> longer technologically and economically feasible. Pioneer will be required to conduct additional <br /> cleanup activities to come into compliance with the Porter-Cologne Water Quality Act. <br /> • As stated in the third paragraph of the MRP, the MRP is issued pursuant to Section 13267 of the <br /> California Water Code under the signature of the Regional Board's Executive Officer. California <br /> Water Code Section 13267 information requirements are orders, are enforceable, and can result in <br /> administrative civil liability if Pioneer does not comply with the MRP. <br /> MRP No. 5-00-846 is now in effect and shall be followed for the fourth quarter 2000 monitoring event. <br /> The next monitoring report due is the annual report on 30 April 2001. If you have any questions, you <br /> may contact Joseph Mello, the Board's project manager, at (916) 255-3077. <br /> WEND'Y L. COHEN, P.E. <br /> Chief, Site Cleanup Unit <br /> Enclosure <br /> cc: San Joaquin County Health Department, Stockton <br /> Mr. Dale Clemens, ASCW-BE, Sharpe Depot, Lathrop <br /> Mr. Bruce Williams, Pioneer Americas, Inc., Tracy <br /> Ms. Eva Hey, SECOR International, Inc., Oakland <br />