Laserfiche WebLink
Mr.,Joe Hofbauer • - 4 - • 10 July 2007 <br /> Pioneer Americas LLC <br /> onsite monitoring well screened within the Lower Horizon. The letter or the work plan <br /> must be submitted to the Regional Water Board by 27 July 2007; <br /> 4. The next groundwater monitoring report due is the annual report of 2007, and is due to <br /> the Regional Water Board on 1 February 2008; and <br /> 5. The first monthly wellhead treatment system monitoring data report is due to the Regional <br /> Water Board on 28 September 2007 for August 2007 activity. <br /> If you have any questions, please contact Jim Brownell at (916) 464-4675, or by email at <br /> jbrownell@waterboards.ca.gov. <br /> ROBERT BUSBY, P.G., C/.` G. <br /> Senior Engineering Geologist <br /> Site Cleanup Unit Chief <br /> Enclosure: Draft Monitoring and Reporting Program <br /> cc: San Joaquin County Health Department, Stockton <br /> Eva Hey, Secor International Incorporated, Lafayette <br /> Jeff Inkes, Pioneer Americas LLC, Tracy <br /> Marshall Cloud, Defense Logistics Agency, Tracy <br />