Laserfiche WebLink
I <br /> J <br /> 200 Beckman <br /> Page 2 <br /> ;j <br /> PHSIEHD, in correspondence dated June 9, 1995, provided,j comments on the <br /> previously submitted corrective action plan. A response to PHSIEHD should be <br /> included in the report that summarizes the results of the additional soil and <br /> groundwater investigation. <br /> :a <br /> If l can answer any questions or to schedule a site inspection, please do not hesitate <br /> to contact me at (209) 468-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Mary Meays, Senior REHS Margar4' Lagorio, HS <br />{ Site Mitigation Unit Supervisor <br /> I <br /> MMI200BECK <br /> enclosure <br /> ! <br /> cc: Elizabeth Thayer, Central Valley Regional Water Quality Control Board <br /> cc: Karla Brasaemle, Weston <br /> J <br /> .i <br /> i <br /> a` <br /> I� <br /> 'i <br />