Mosquito Abatement District <br /> Page 3 <br /> Site Status <br /> Following the removal of the underground storage tanks, soil contamination was 7 <br /> excavated .to 27 feet below ground surface., Residual soil contamination. was <br /> detected,up .to, 12 ppm TPH. However, the detection limits used for BTX were too: ,.. <br /> high and sidewall samples were not collected. <br /> On April 13, 1987, to verify that the on site well was not affected by the petroleum <br /> hydrocarbon release, a sample was collected and analysis indicated that the well was <br /> not contaminated and that,,groundwater within the well was noted at 28:feet below. 4 i <br /> ground surface. <br /> Subsequently, two new tanks (#9 and #10) were installed in the area excavated. <br /> On December 4, 1991, a UAR and Prop,65 notification were filed,by..PHSIEHD. <br /> Correspondence prepared by PHSIEHD dated December 23, 1991 informed,you that <br /> a UAR was fled and that additional investigation of the site was required- <br /> On February 3, 1994, you were notified that,a work plan to install monitoring wells <br /> and to continue the soil investigation should be submitted—Jin-July seven soil . F <br /> boring were drilled,three of which were converted into monitoring wells and two were <br /> continued to allow the collection of groundwater samples using a hydropunch. The <br /> results from this investigation indicated that there was possible residual,soil <br /> contamination 'in'the area of former tanks41, #2 and #4. • -, <br /> In order to confirm that groundwater.has .not-been impacted,,additional groundwater <br /> monitoring and sampling should be scheduled by March 31, 1995. <br /> As _P.HS/EHD requested during the recent meeting, a summary,of,all:the prior soil and Y <br /> groundwater analytical results.from the tank,removals, over-excavation, soil borings, , <br /> groundwater monitoring wells and hydropunches should be,prepared,and. submitted. <br /> immediately. A-corrective action plan estimating the volume and concentration of <br /> residual soil contamination should be submitted by May 15;" 995. As'you in <br /> the District is evaluating the necessity of retaining use of tanks #9 and #10. If these <br /> tanks are removed, it will likely occur sometime between April and June 1995 and at <br /> that time additional remedial investigation will occur. <br /> If you have any questions.or to schedule a site inspection to�witness sampling, <br /> please contact Mary Meays at (209) 468-0337..' <br /> Donna-Heran, RENS; Director , 4 <br /> Environmental Health Division <br /> Mary Meays,'Senior REHS, 7 -Diane M. Hinson, RENS -r <br /> Site Mitigation Unit .. : Y=`Supervisor <br /> MM/MOSQUITO w <br /> cc: Elizabeth Thayer, Central Valley Regional Water Quality Control Board <br />