My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
200
>
2900 - Site Mitigation Program
>
PR0522015
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 4:46:18 PM
Creation date
2/6/2019 9:57:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522015
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0015207
FACILITY_NAME
DESALVATORE PROPERTY
STREET_NUMBER
200
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905066
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
200 N BECKMAN RD LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> will be the responsibility of SJC/MVCD. Services reridered by Kleinfelder to repair them <br /> will be billed at cost. Underground Service Alert SA) at 1-800-642-2444 provides a <br /> partial location service free of charge for major utility ines. It is important that SJC/MVCD <br /> understand that subsurface utilities buried under priva e property will not be marked by the <br /> public utility companies contacted by USA. <br /> ➢ The cover letter is an integral part of this proposal. <br /> ➢ Kleinfelder is not responsible for the site safety of other . <br /> ➢ Inclimate weather may impact the schedule and estimat d costs <br /> ➢ Two copies of all documents will be delivered tote client. Additional copies can be <br /> provided on a time and expense basis. <br /> ➢ Client meetings and revisions to the reports are not in luded in the budget estimate, but can <br /> be provided on a time and materials basis at the client's request. <br /> APPROXIMATE PROJECT SCHEDULE <br /> Based on the proposed methodology, scope and assumptions described above, the following <br /> approximate project schedule has been formulated: <br /> Approximate Task <br /> Timeline <br /> Week 0 Formal authorization provided by the client <br /> Week 1 - 4 Field Activities <br /> Week 4— 7 Chemical Analyses <br /> Week 7— 9 Reporting <br /> AUTHORIZATION <br /> A signed original proposal, returned to us, will serve as o formal authorization to proceed. If <br /> there is a need for any change in the proposal, please call s immediately. Changes may require <br /> revision of the proposed fee, which will be communicated to you upon assessment of the <br /> requested changes' effect on the fee. <br /> This proposal will remain in effect for 90 days from the date shown on the proposal and therefore <br /> shall be null and void unless our original proposal for the work performed has been accepted <br /> using the acceptance signature block by an authorized client representative and the entire <br /> proposal returned to Kleinfelder. <br /> LIMITATIONS <br /> Kleinfelder prepared this proposal in accordance with generally accepted standards of care which <br /> exist in San Joaquin County at this time. It should be recognized that definition and evaluation <br /> of geologic and environmental conditions are a difficult and inexact science. Judgments leading <br /> 02001PROP.ENV/ST03P327 Page 9 of I1 <br /> ©2003 Kleinfelder,Inc. September 3,2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.