My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
500
>
2900 - Site Mitigation Program
>
PR0523834
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 1:16:57 PM
Creation date
2/6/2019 1:10:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523834
PE
2950
FACILITY_ID
FA0016052
FACILITY_NAME
RE SERVICE CO
STREET_NUMBER
500
Direction
S
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04925081
CURRENT_STATUS
02
SITE_LOCATION
500 S BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/11Claytori <br /> 4.1. CHEMICAL HAZARDS Ouv <br /> Potential hazards generally associated with chemical contamination identified at the <br /> project site reside in the soil and groundwater in areas where products were previously <br /> ' handled and are suspect primarily in the seven areas designated for excavation. The <br /> affected soils, and/or groundwater, if present, include exposure through the following <br /> routes: (1) skin or eye contact resulting in skin damage and in some cases, dermal <br /> absorption; (2)inhalation of chemical vapors, dust or gases; and, (3) ingestion of <br /> chemicals. A list of chemicals and the exposure pathways and health effects anticipated <br /> to be encountered on site is included in Appendix B. <br /> To minimize the potential for exposure to chemical contaminants,personal protective <br /> equipment as specified in this plan must be worn. Site control measures will also be <br /> ' taken to minimize exposures and to provide for contingency measures. <br /> 4.2. PHYSICAL HAZARDS <br /> The following sections describe potential physical health and safety hazards associated <br /> with work activities at the site. <br /> 4.2.1. Traffic and Heavy Equipment <br /> Clayton will perform environmental oversight during the soil sampling at the project site. <br /> The activities will involve the use of various types of portable equipment under the direct <br /> control of the subcontractors retained by Clayton. Clayton will observe subcontractor <br /> activities during the use of their equipment during sampling to insure that they comply <br /> with the following safety measures. <br /> Stay at least 20 feet away from moving equipment. If closer than 20 feet: <br /> ➢ Keep equipment in sight at all times. <br /> ' ➢ Inform the operator of your location. <br /> 4.2.2. Underground Utilities Hazards <br /> ' Clayton is responsible for contacting Underground Service Alert(USA). Clayton made <br /> the appropriate notification as required by law prior to digging or drilling. Underground <br /> utilities were marked by USA subscribers prior to commencement of work. Additionally, <br /> it is Clayton's responsibility to contract with a professional underground utility locator to <br /> locate identifiable utilities in all boring, trenching and foundation areas <br /> 4.2.3. Lifting Heavy Objects <br /> To prevent back injury resulting from lifting heavy objects: <br /> ➢ Bend your knees <br /> ' PLI \a%PROJECTM2003505628 RE Service Company\H&SP.doe 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.