My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
880
>
2900 - Site Mitigation Program
>
PR0543466
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 1:27:28 PM
Creation date
2/6/2019 1:21:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543466
PE
3528
FACILITY_ID
FA0004942
FACILITY_NAME
MATAGA OLDS BUICK INC
STREET_NUMBER
880
Direction
S
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95241
APN
04925026
CURRENT_STATUS
02
SITE_LOCATION
880 S BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%=Of <br /> STATE LICENSE No. 323417 <br /> OIL EQUIPMENT SERVICE <br /> CLASSIFICATION: A-HAZ., C61D40 <br /> Division of Keith A. Tallia, Inc. STATE ENVIRONMENTAL ASSESSOR No.: D1781 <br /> Telephone: (249) 754-1808 <br /> Post Office Box 950 <br /> 750 Industrial Way <br /> SAN ANDREAS, CALIFORNIA 95249 <br /> HEALTH and SAFETY PLAN <br /> 1) The site location for the proposed job of over excavating a <br /> hole where a small waste oil tank was previously removed . <br /> 2) Mataga Olds , Buick <br /> 880 So . Beckman Road <br /> Lodi , CA 95240 <br /> 209-333-2233 <br /> 3) The project manager , and the health and safety coordinator is <br /> Keith A . Tallia of Oil Equipment Service . The site safety <br /> officers at the job site will be Keith A . Tallia of Oil <br /> Equipment Service . The alternate site safety officer will be <br /> James P . Hesketh of Oil Equipment Service . <br /> 4) Oil Equipment Service will have on the site ( 2) fire extin- <br /> quishers and one ( 1) first-aid kit within 50 ' of hole location . <br /> See attached map . No smoking will permitted within 50 ' of <br /> the hole or areas where flammable vapors are present . <br /> 5) Oil Equipment Service shall notify the local fire department <br /> 48 hours before excavation shall begin . USA will also be <br /> notified before excavation o.f job . <br /> 6) Oil Equipment Service will approach all excavations with <br /> possible cave-ins : The following rules will be followed to <br /> prevent any mishaps : 1) soil to be inspected for stability <br /> before excavation begins , 2) soil is to be kept at least two <br /> (2) feet from the edge of an excavation , 3) if excavation is <br /> five (5) feet or more the hole shall be tapered , braced , or <br /> other equivalent methods shall be used to prevent possible <br /> cave-ins . Precautions will be taken at all times . <br /> 7) At the job site , clean fill will be used to backfill the empty <br /> hole after soil samples have been taken by Condor Earth <br /> Technologies Inc . Soil samples will be excavated using backhoe . <br /> Samples will be taken two (2) feet to four (4) feet by hand <br /> using brass tubes . All of the above procedures will be done <br /> according to code . Any part not backfill shall be barricaded <br /> with construction barricades and caution tape will be used . <br /> All sampling to be per Condors workplan . <br />
The URL can be used to link to this page
Your browser does not support the video tag.