My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 4:32:37 PM
Creation date
2/6/2019 4:13:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Quarterly Status Summary Report Fourth Quarter 2011 <br /> Chevron and ARCO Commingled Plume No. CP0034 <br /> February 2, 2012 <br /> 1.0 INTRODUCTION <br /> Service Station No: Chevron Facility#9-4275 and ARCO Service Station No. 2133 <br /> Site Address: 2905 and 2908 West Benjamin Holt Drive, Stockton, California <br /> 95207 <br /> Contact: Ms. Stephanie McKenna Mr. Sergio Morescalchi <br /> Chevron Environmental Operations Project Manager <br /> Management Company Atlantic Richfield Company <br /> (Chevron) (ARC), a BP Affiliated Company <br /> 6101 Bollinger Canyon Road P.O. Box 1257 <br /> San Ramon, California 94583 San Ramon, California 94583 <br /> Consulting Company: Stantec Consulting Services Inc. — Mr. Brian Westhoff <br /> Stantec Project No.: 211602060.500.0002 <br /> Primary Agency/ Contact: San Joaquin County Environmental Health Department/ <br /> Ms. Lori Duncan <br /> A Site plan is included as Figure 1. No changes have been made to the previous investigations <br /> and site history since the last report submittal (Quarterly Groundwater Monitoring Report Third <br /> Quarter 2011, October 26, 2011). <br /> 2.0 SITE INFORMATION <br /> Current phase of project: Groundwater monitoring and sampling <br /> Chevron frequency of monitoring and Semi-annually(1Q/3Q): MW-2R and MW-5R <br /> sampling: Annually(1 Q): MW-1 R, MW-3R, MW-6, <br /> p g' MW-7R, MW-8, MW-9R, and MW-10 <br /> Semi-annually (1Q/3Q): E-3, E-4, E-6, E-9, <br /> and E-10 <br /> ARCO frequency of monitoring and sampling: Annually (1Q): E-2, E-5, E-11, E-12, PR-1, <br /> PR-2, BHD-2, MW-1, MW-2, MW-3, and <br /> MW-5 <br /> Have separate-phase hydrocarbons (SPH) No <br /> historically been found on-site?: <br /> Historic range in depth-to-water(DTW) <br /> ft below top of casing (TOC)from May 1989 to 3.92 PR-2 (1 Q98)to 22.19 E-11 (3Q91) <br /> July 2011: <br /> Two water supply wells 800 ft and 1,000 ft <br /> Water supply wells within a 2,000-foot radius southwest of the site. <br /> and their respective direction: The municipal well on the northeast corner of <br /> Ben Holt and Plymouth Road was <br /> decommissioned during summer of 2011. <br /> Current remediation technique: Natural attenuation <br /> 94275 QSSR 4Q11.doc 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.