My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 4:32:37 PM
Creation date
2/6/2019 4:13:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Quarterly Groundwater Status Summary Report Fourth Quarter 2011 <br /> Chevron and ARCO Commingled Plume No. CP0034 <br /> February 2, 2012 <br /> 5.0 DISCUSSION AND RECOMMENDATION <br /> 51 DISCUSSION <br /> 5.1.1 Groundwater Sampling Results <br /> k <br /> No groundwater samples were collected during 4Q1 T. <br /> 5.1.2 Remediation System Updates <br /> During the quarter, no changes have.been made to the remedial equipment located on property. <br /> The system remains non-operational. <br /> 5.1.3 Site Conceptual Model Updates _ <br /> No new data was gathered during 4Q11 to necessitate an update to the Site Conceptual Model. <br /> 5.1.4 Trends <br /> No new data was gathered during 4Q11 to compare-with previous trends: <br /> 5.1.5 Data Gaps <br /> Stantec has not identified any data gaps_ within` the data gathered for the Quarterly Status <br /> Summary Report Fourth Quarter 2011. <br /> 5.1.6 Plume Stability <br /> No new data was gathered during 4Q111 to determine plume stability. Data gathered during <br /> previous quarterly monitoring and sampling events indicate that the plume is stable and that the <br /> current well array delineates the plume. <br /> Recommendations <br /> 5.1.7 Protocol Changes <br /> Stantec recommends continuing the current monitoring and sampling schedule for the site. <br /> 5.1.8 Future Work <br /> Stantec will perform the next semi-annual monitoring and sampling event during the first quarter of <br /> 2012. <br /> Stantec will conduct a sensitive receptor survey and submit a No Further Action Report for review. <br /> 94275 QSSR 4Q11.doc 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.