Laserfiche WebLink
2905 Benjamin Holt <br /> Page 2 <br /> PHS/EHD indicated that once final remediation design was justified and <br /> demonstrated, that PHS/EHD would view Chevron's efforts as evoking best available <br /> technology. <br /> The following compliance schedule was established with all parties in agreement. <br /> Activity Compliance Date <br /> Submit a drilling permit with an December 23, 1995 <br /> amended site map and a health and <br /> safety plan <br /> Submit a permit application to the San January 15, 1996 <br /> Joaquin Valley Unified Air Pollution <br /> Control District <br /> Submit a building permit application to January 30, 1996 <br /> the City of Stockton <br /> Start up interim remediation system April 15, 1996 <br /> Submit a Corrective Action Plan October 15, 1996 <br /> evaluating system design per California <br /> Code of Regulations <br /> Please note that to date, PHS/EHD has not received the drilling permit application as <br /> agreed during the December 8, 1995 meeting. The drilling application, amended site <br /> map and health and safety plan must be submitted within 14 days of the date of this <br /> letter to avoid the scheduling of an administrative hearing. <br /> If you disagree with this summary, please contact me at (209) 468-0337. <br /> Donna Heran, RENS, Director <br /> Environmental Health Division <br /> Mary Meays, Senior RENS Diane XHinson, R HS <br /> Site Mitigation Unit Supervisor <br /> MM/2905BHAA <br /> cc: Elizabeth Thayer, CVRWQCB <br /> David Irey, San Joaquin County Deputy District Attorney <br /> Kent O'Brien, Geraghty and Miller <br />