My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000400
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 9:51:46 AM
Creation date
2/7/2019 8:59:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000400
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SVE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br />.ate Time of Arrival X <br /> Technician Z Time of Departure <br /> Site Engineer Rusty Benkosky Was Site Engineer contacted in the field?Yes , No <br /> PART A GENERAL INFORMATION <br /> Site Location 1401 Munras Blvd,Montere ,CA Protect No 77BP 52133 01 0335 <br /> Abatement Equipment Katox 100 ofm catalytic oxidzer Serial No <br /> Serial No <br /> Serial No ��rr u <br /> SVE Slower Turbotron, 10 HP Max Amp Rating C� / <br /> Air Sparge Blower Tuthill 5 HP Max Amp Rating Z? <br /> Telemetry None <br /> Electrical Power 230V Single Phase Electric Meter Reading 9 <br /> No of knockout barrels at site Full Empty 100 eft- Q <br /> PART B SVE SYSTEM -VAPOR PHASE DATA <br /> i) Catalytic Oxidizer Operation Data <br /> isSystem up or down upon arrival / (If down6llease complete PART D) <br /> Oxidizer Hourmeter Reading At time 7 <br /> Flow Data Before Adjustment After Adjustment Final <br /> %Dilution air valve open <br /> %Recirculation valve open <br /> K/O Content <br /> Vacuum ® blower inches Hg <br /> Amps Drawn by blower motor(Amps) <br /> Total System Flow(A P,in H2O) <br /> —Pipe Size 0 " <br /> Well Field Air Flow(A P, in H2O) <br /> Pre Size 0 " <br /> Dillution Air Flow(A P, in H2O) <br /> Pi a S¢e " <br /> Note The sum of Dilution+Well Field Flow should be within+/ 10%of the Total System Flow <br /> Completed By Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.