Laserfiche WebLink
. PART B Continued SVE SYSTEM -VAPOR PHASE ABATEMENT EQUIPMENT DATA <br /> 11) FID DATA <br /> CATALYTIC OXIDIZER Without Carbon With Carbon Difference <br /> Oxidizer Influent my before dilution) <br /> Oxidizer Effluent(p mv) <br /> Field Instrument Used Last Calibrated <br /> 111) CATALYTIC OXIDIZER <br /> JiBef re Ad a Final Ideal Range <br /> Oxidizer Setpomt(°F) <br /> Inlet Temperature(°F) <br /> High Temp Setpoint(°F) <br /> Catalyst Temperature(°F) <br /> Exhaust Temperature(°F) <br /> Field Instrument Used Last Calibrated <br /> PART C AIR SPARGE SYSTEM DATA <br /> System up or down upon arrival'? kt� If down,please complete Part E <br /> Hourmeter Reading �sy p2n�-��� At time <br /> Before Adjustment Final ideal Range <br /> TotalBlower/Com ressor flow(cfm) �0 71 d 7f <br /> Pressure at blower/compressor(psi) <br /> Amps drawn b blower motor(amps) <br /> Air filter changed /nom <br /> PART D TROUBLESHOOTING(complete If system was down upon arrival at site) <br /> a Give details of system status upon arrival <br /> b Give details of work performed to troubleshoo the problem <br />