Laserfiche WebLink
SVE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> 101ite // 7 QZ Time of Arrival <br /> Technician �� � �� Time of Departure <br /> Site Engineer Rusty Benkosky Was Site Engineer contacted in the field?Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location 1401 Munras Blvd,Monterey,CA Project No 778P 52133 01 0335 <br /> Abatement Equipment Katox 100 cfm catalytic oxidzer Serial No <br /> Serial No <br /> Serial No J <br /> SVE Blower Turbotron,10 HP Max Amp Rating <br /> Air Sparge Blower Tuthill 5 HP Max Amp Rating <br /> Telemetry None <br /> Electrical Power 230V Single Phase Electric Meter Reading <br /> No of knockout barrels at site Full Empty <br /> PART B SVE SYSTEM -VAPOR PHASE DATA <br /> 1) Catalytic Oxidizer Operation Data _ <br /> 5THy <br /> L <br /> System up or down upon arrival (If dowyYplease complete PART D) <br /> Oxidizer Hourmeter Reading /� At time <br /> Flow Data Before Adjustment After Adjustment Final <br /> %Dilution air valve open <br /> %Recirculation valve open <br /> K/O Content <br /> Vacuum @ blower(Inches Hg <br /> Amps Drawn by blower motor(Amps) <br /> Total System Flow(A P, in H2O) <br /> Pipe Size <br /> Well Field Air Flow(A P, In H2O) <br /> Pipe Size " <br /> Dillution Air Flow(A P,in H2O) <br /> Pipe Size 0 " <br /> Note The sum of Dilution+Well Field Flow should be within+1- 10%of the Total System Flow <br /> Completed By Date <br />