Laserfiche WebLink
PART B Continued SVE SYSTEM -VAPOR PHASE ABATEMENT EQUIPMENT DATA <br /> 1 <br /> 11) FID DATA <br /> CATALYTIC OXIDIZER Without Carbon With Carbon Difference <br /> Oxidizer Influent my before dilution) <br /> Oxidizer Effluent(ppmv <br /> Field Instrument Used Last Calibrated <br /> 111) CATALYTIC OXIDIZER <br /> Before Adjustment Final Ideal Range <br /> Oxidizer Setpoint(°F) <br /> Inlet Temperature(°F) <br /> High Temp Setpoint(°F) <br /> Catalyst Temperature(°F) <br /> Exhaust Temperature(°F) <br /> Field Instrument Used Last Calibrated <br /> PART C AIR SPARGE SYSTEM DATA <br /> System up or down upon arrival? If down,please complete -- <br /> HourmeterReading No Jir h.'�Tr� At time <br /> Before Adjustment Final Ideal Range <br /> TotalBlower/Com ressor flow cfrn <br /> Pressure at blower/compressor(psi) <br /> Am s drawn by blower motor(amps) <br /> Air filter changed(y/n)l <br /> PART D TROUBLESHOOTING(complete if system was down upon arrival at site) <br /> a Give details of system status upon arrival <br /> b Give details of work performed to troubleshoot the problem <br /> r� <br />