My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:29:29 PM
Creation date
2/7/2019 10:28:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 '"401W <br /> KYLE CHRISTIE <br /> PAGE 3 <br /> 1612 Hammer Lane, Stockton ARCO Facility #548 <br /> PHS/EHD contact - Mary Meays <br /> The report submitted to PHS/EHD to compare this site with ARCO station #760 located at 225 <br /> South Cherokee Lane in Lode was discussed. <br /> The calculation of the mass volume of hydrocarbons evidenced in the soil and <br /> groundwater needs to be revised in the following areas: <br /> -The concentration used in the area between the isoconcentration lines should be <br /> representative of the most conservative value. Specifically, for the area between the <br /> outer isoconcentration line and the inner line, please use the outer line value instead of <br /> the inner line value. Groundwater data must be included in the mass volume <br /> determination. The distances used in the volume calculations should be measured in a <br /> conservative and consistent manner. <br /> -A determination of the total volume of each constituent would be helpful, or, possibly, <br /> a total volume of TPH as gasoline and a total volume of all BTEX constituents <br /> combined. <br /> Please provide a reference table of any values used in the calculations from published <br /> sources. <br /> Monitoring wells MW#1 through MW#4 were reportedly repaired recently. The generally <br /> unkempt condition at this site that was observed during the last site visit was discussed. The <br /> improper cleanup of ongoing surface spillage causing further environmental damage could <br /> result in a referral to another agency for follow up. <br /> Kyle Christie stated that he could be contacted directly when problems or questions arise. He <br /> stated that the information is not always transmitted to him. <br /> The quarterly report for this site was submitted at the meeting. <br /> 2908 W. Ben Holt, Stockton ARCO Facility #2133 <br /> PHS/EHD contact - Mary Meays <br /> The start up of the remediation system at this site was delayed due to last minute design <br /> corrections with the electrical amperage requirements and the stack height. However, the <br /> system is to begin operation on Monday, November 21, 1994, with source testing to be <br /> conducted on Tuesday, November 29, 1994. PHS/EHD will be notified of any schedule <br /> changes and with a specific time. <br /> The sampling of the wells at the site are going to be coordinated with the vapor extraction <br /> system testing to be included in the quarterly reports. This will allow for more consistent and <br /> comparable results. Additionally, the coordinated groundwater sampling between this site and <br /> the Chevron facility across the street should continue after the sampling program returns to <br /> Brown and Caldwell. Kyle Christie recommended that the water level tapes being used at <br /> each site be compared to ensure accuracy with the data. <br /> 85 East Louise, Lathrop ARCO Facility #6080 <br /> PHS/EHD contact - Linda Turkatte <br /> This site is considered to be a low priority site with respect to the other Arco sites in San <br /> Joaquin County. The third quarter quarterly report is still pending but will be submitted soon. <br />
The URL can be used to link to this page
Your browser does not support the video tag.