My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012556
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0012556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 11:41:34 AM
Creation date
2/7/2019 11:15:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012556
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13rown and Coldweil RECEIVED <br /> HeConsuitants J U L 2 5 1991 <br /> :23 5 Street <br /> ENVIRONMENTAL HEALTH <br /> arnla j5a14-7092 <br /> X9'51444 Ot23 <br /> r-�19tCi144�-ria3i " <br /> July 19, 1991 <br /> Mr. Chuck Carmel <br /> ARCO Products Company <br /> 2000 Alameda de las Pulbas <br /> Post Office Box 5811 017_5690-4111 <br /> San Mateo, California 94402 <br /> Subject: Status of Groundwater Extraction System,ARCO Station 2133, <br /> Stockton, California <br /> Dear Mr. Carmel: <br /> r. This letter presents the current status of the groundwater extraction system and the results of the <br /> groundwater discharge sampling at ARCO Produ+,-ts Company Station 2133, located at 2908 <br /> Benjamin Holt Drive, Stockton, Caiifocrtia. Listed chronologically below is a summary of the <br /> activities related to the discharge of groundwater at the site from?une 6 through July 15, 1991. <br /> Thi concentration,C,in the Junc 17 status letter should have been shown in mgll instead of ugA <br /> in the column heading. Also, W = 0.0042 for 0.35 gpm instead of 0 0130 as shown. The <br /> calculation results are correct as shown in the June 17 Iener. <br /> 6111191 Calibrated LEL sensors. Collected effluent water sample for laboratory analysis of <br /> total petroleum hydrocarbons(TPH)and benzene,ethylbenzene,toluene, and xylenes <br /> (BETX). Table 1 presents a summary of the detected constituents for the extraction <br /> system. <br /> 6126191 Sampled extraction system for BETX and TPH. The results of this sample are not yet <br /> available. <br /> The average daily flow during this reporting period(40 days)was approximately 10.6 gallons per <br /> mir=:.m. The total flow for this period was 610,600 gallons. <br /> V <br /> :�1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.