Laserfiche WebLink
L 1 <br /> 3 <br /> a <br /> Mr. Chuck Carmel <br /> July 1 Q, 1991 <br /> Page 2 <br /> The fd_lo.,ving calculation of pounds Per day of each constituent, <br /> Q = Average flow rate,9Prn } <br /> C Concentration,ug/1 <br /> W = Average amount of Chemical discharged,lbs/day <br /> W _ Q x 1,440 x 8.34 x CI(1,0OO,000,000) = 0.00013 C at Q= 10.8 ppm <br /> k <br /> C•u�L W lhsda <br /> TPH 1.3 (mg)1) 0.02. <br /> l90 025 <br /> Benzene 0,0029 ' <br /> Ethylbenzene 22 i <br /> 120 0.016 <br /> Toluene 0.014 <br /> Xylenes 110 <br /> i <br /> status letter will include the interval from July 16 through Au&vst 15, 1991. f--. <br /> The next monthly <br /> sner at (916)q44-Oli3 if you have any questions. <br /> Please call Nir. Steve Mi <br /> I <br /> .fiery truly yon, I <br /> BROWNAND CALDWELL i <br /> I <br /> Steven D.Misner <br /> Project Manager <br /> SDM:DW—.jrb <br /> Enclosure <br /> cc: Mr. Frank Tucker,City of Stockton <br /> Conuol Board <br /> California Regional Quality ; <br /> Mr. Jim lvlaugh?%,, E <br /> •`San Joaquin County <br /> Mr. Chris Winsor,ARCO Products Company <br /> { <br /> k <br /> Brown and Caldwail <br /> ie'` <br />