My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1986 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:00:44 PM
Creation date
2/7/2019 2:53:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERFORMED BY SACRAMENTO EQUIPMENT MAINTENANCE COMPANY, INC. <br />2533 CONNIE DRIVE — SACRAMENTO — CALIFORNIA 95815 <br />PHONE 916-925-2716 <br />WORK ORDER # _lam 02 22 7 DATE <br />SITE NUMBERt <br />SITE NAMEe v PRODUCT <br />SITE ADDRESSt nSTP BRAND _Tnlc/� 7;,v, <br />r F� <br />ED JACKET LEAK. DETECTOR TEST <br />PRODUCTt P.ESLLAP., UNLEADED, PP.EkIU�!—LNLEADED' DIESEL (CIRCLE ONE) <br />NOTE; USE SEPARATE FORM FOR EACH TANK. <br />1) RUNNING PRESSURE <br />2) SHUT—OFF PRESSURE <br />3) <br />AMOUNT OF <br />PRODUCT RELEASED <br />THRU <br />BIBCOCK TO ZERO. <br />_:� OZ_ <br />4) <br />WITH VALVE <br />OPEN, START STP. <br />LIS <br />PRESSURE <br />PSI. <br />5) REDUCE FLOW TO -RATE OF 7 OZ. PER MINUTE, <br />LIST PRESSURE AT THIS FLOW RATE PSI. <br />6) TURN STP OFF. LET PRESSURE DROP TO ZERO THRU LEAK JUST <br />CREATED. LIST TIME FOR GAUGE TO REACH ZERO. = MIN. Li SEC. <br />7) TURN THE STP BACK. ON. KEEP LEAK RATE AT BIBCOCK. <br />LIST PRESSURE -LI.,— PSI. FLOW RATE AT NOZZLE GPM. <br />8) STOP LEAK WITH STP STILL ON. <br />DOES LEAK DETECTOR RESET? YES NO <br />IF YES, HOW LONG TO RESET? MIN._ SEC. <br />9) TURN STOP OFF. LIST PRESSURE PSI. <br />10) TURN STP BACK ON. <br />LIST TIME TO REACH PRESSURE RISE. ---MIN. �_ SEC. <br />11) LIST PRESSURE •3Q_ PSI. <br />12) OPEN NOZZLE AND LIST PRESSURE , . !30 PSI. <br />13) SATISFACTORY LEAK DETECTOR _� YES N0. <br />THIS TEST IS FOR LEAK DETECTOR SERIAL # <br />LEAK DETECTOR <br />(OLD) MODEL DATE CODE & SERIAL NUMBER <br />(NEW) MODEL DATE CODE & SERIAL NUMBER <br />
The URL can be used to link to this page
Your browser does not support the video tag.