My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1986 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:00:44 PM
Creation date
2/7/2019 2:53:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />PERFORMED BY SACRAMEENTO EaUIPMENT MAINTENANCE COMPANY, INC. <br />2533 CONNIE DRIVE - SACRAMENTO - CALIFORNIA - 95815 <br />PiONE 916-92572716 <br />WORK ORDER #_ GO 2 2 7 DATE c G <br />SITE NUMBERt PRODUCT vo & <br />SITE NAME: STP BRAND <br />SITE ADDRESS: 607FFA01 I' S AD,� <br />RED JACKET LEAK. DETECTOR TEST <br />PRODUCT: REGULAR [1NLERD PREMZUK-UNLEADED, DIESEL (CIRCLE ONE) <br />NOTE: USE SEPARATE FORM FOR EACH TANK. <br />1) RUNNING PRESSURE _ !S d <br />2) SHUT-OFF PRESSURE Zcf <br />3) AMOUNT OF PRODUCT RELEASED THRU BIBCOCK TO ZERO. ,Ig OZ. <br />4) WITH VALVE OPEN, START STP. LIS PRESSURE /-/ PSI. <br />5) REDUCE FLOW TO -RATE OF 7 OZ. PER MINUTE. <br />LIST PRESSURE AT THIS FLOW RATE --7Z e_1 PSI. <br />6) TURN STP OFF. LET PRESSURE DROP TO ZERO THRU LEAF; JUST <br />CREATED. LIST TIME FOR GAUGE .TO REACH ZERO. _ MIN. LS SEC. <br />7) TURN THE STP BACK. ON. KEEP LEAK. RATE AT BIBCOCK. ' <br />LIST PRESSURE %L/ PSI. FLOW RATE AT NOZZLE !//G GPM. <br />8) STOP LEAF; WITH STP STILL ON. <br />DOES LEAF; DETECTOR RESET? YES NO <br />IF YES, HOW LONG TO RESET? MIN._ SEC. <br />9) TURN STOP OFF. LIST PRESSURE 1— PSI. <br />10) TURN STP BACK. ON. <br />LIST TIME TO REACH PRESSURE RISE. MIN. SEC. <br />11) LIST PRESSURE _SO_ PSI. <br />12) OPEN NOZZLE AND LIST PRESSURE 2"�) PSI. <br />13) SATISFACTORY LEAK DETECTOR YES NO. <br />THIS TEST IS FOR LEAK DETECTOR SERIAL # 4?06 - 9920 <br />LEAF; DETECTOR <br />(OLD) MODEL DATE CODE & SERIAL NUMBER <br />(NEW) MODEL DATE CODE & SERIAL NUMBER <br />u <br />i - <br />
The URL can be used to link to this page
Your browser does not support the video tag.