Laserfiche WebLink
MONITORING AND RESPONSE PLAN - SC <br /> ARCO PRODUCTS COMPANY FACILITY WITH <br /> DISPENSER SPILL CONTAINMENT DEVICES <br /> ARCO FACILITY: 6100 ADDRESS: 25775 S. Patterson Pass Road <br /> Tracy, CA <br /> This is a monitoring and response plan of action for facilities with spill containment devices installed beneath the <br /> dispensers. <br /> 1. CONTAINMENT EQUIPMENT <br /> Secondarily contained storage tanks and lines at this facility are to be monitored by a continuous electronic <br /> leak detection system, which consists of an alarm panel, sensors and associated electronics. Liquid <br /> sensors are installed in the annular space of each double-wall tank and product line-piping sump, as well as <br /> at each one of the dispenser containment sumps. Whenever a sensor detects presence of liquid, there is <br /> both an audible and visual alarm at the control panel. In addition, this continuous monitor on the piping <br /> system will shut down the pump and activate the alarm system when a release is detected or the <br /> continuous product piping monitoring system fails or is disconnected, the pumping system will shut down. <br /> Electronic automatic leak detectors (3GPH) are installed on the secondarily contained pressurized product <br /> piping as part of the turbine. The line leak detector will detect a loss of pressure in the product lines and <br /> restrict the flow of product. <br /> The model numbers for the associated montioring system are as follows: <br /> Description Model Number <br /> Monitoring Panel —Veeder Root TLS 350 Monitoring VR-847090-002 <br /> Control Panel <br /> Liquid Sensor for the Tank Annular Space—Veeder Root VR-794390-409 <br /> Liquid Leak Sensor at Turbine Sump—Veeder Root VR-794380-205 <br /> Liquid Leak Sensor at Dispenser Containment VR-794380-208 <br /> Sumps—Veeder Root <br /> Mechanical Line Leak Detector/3GPH Vaporless <br /> 2. MAINTENANCE SCHEDULE <br /> The containment devices will be inspected according to the manufacturer's instructions by an outside <br /> contractor once during each calendar year. <br />