Laserfiche WebLink
3. ROUTINE MONITORING PROCEDURE <br /> On a weekly basis, the facility operator shall: <br /> A. Inspect each containment box for the presence of a liquid. <br /> B. Remove debris form the containment box. <br /> If any liquid is found, manually close the impact valve, place the dispenser "Out of Service, and call ARCO <br /> Maintenance immediately. <br /> 4. RESPONSE PROCEDURE -CONTAINMENT BOXES <br /> OPERATOR RESPONSIBILITIES <br /> In the event the impact valve is activated and shuts down a dispenser, station personnel immediately: <br /> A. Contact ARCO Maintenance or its designated agent by using the telephone number previously <br /> provided. <br /> B. Tag the dispenser"Out of Order" until the liquid has been removed by authorized persons. <br /> ARCO RESPONSIBILITIES <br /> Method of removing an unauthorized release from the spill containment device: <br /> A. Any unauthorized release into the containment box will be removed by ARCO in accordance with <br /> California Health and Safety Code requirements. In the event of an emergency, a pumping <br /> contractor or truck will be available immediately. In all other cases, equipment availability will be <br /> within 12 hours. <br /> B. ARCO maintenance will be responsible for authorizing and selecting contractors for the work to be <br /> performed. <br /> 5. TRAINING <br /> All employees must be trained in the subject mentioned in Sections 3 and 4 above. Training needed for the <br /> operation of the dispenser containment devices shall include how to inspect the equipment and to manually <br /> close the dispenser impact valve. <br />