My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1986 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:00:44 PM
Creation date
2/7/2019 2:53:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM TAIT & ASSOCIATES - Sac =_nto FAX NO. 9166352606 Jan. 02 2002 11:07RM P10 <br /> . M <br /> The LD-2000 leak detector is a <br /> mechanical, pressure sensitive, <br /> continuous duty line monitor, <br /> It has unique design and <br /> function, yet it is designed for use in standard submersible pumps or adapter tees. <br /> A patented, internal, free-floating check valve positioned at the downstream end of the leak <br /> detector protects the leak detector against damage caused by hydraulic hammer (a rebounding <br /> pressure wave formed when the dispenser nozzle is closed. The check valve also maintains <br /> line pressure, sufficient to allow dispensation of fuel immediately, providing that the down- <br /> stream dispensing line has no leak. <br /> FEATURES <br /> • Maintains pressure in the delivery line when no leak is present <br /> 0 Detects leaks even if substantial hydrostatic shock occurs in the dispensing line <br /> ♦ Reduces unscheduled pump maintenance due to check valve deterioration or <br /> functional element deterioration <br /> • Provides improved performance under extreme climatic conditions <br /> • Sees a leak of 3 GPH or smaller at 10 psi for a full 18 months after date of installation- <br /> guaranteed <br /> • Overcomes problems caused by thermal contraction and Iine resiliency in larger <br /> delivery systems <br /> TEST RESULTS - A nationally-recognized independent environmental consulting firm <br /> conducted twice the mandated number of EPA protocol tests on the LD-2000. Here is what <br /> they found: <br /> • The LD-2000 exceeds the EPA regulations that require detection of a 3 GFH leak at 10 psi <br /> with a detection probability of 95% and a false alarm probability of 5%. Under conditions <br /> of thermal expansion or contraction, the LD-2000 is capable of detecting a 3 GPH leak with <br /> a probability of detection of 100% and a false alarm probability of 0%. <br /> • Under neutral test conditions, the LD-2000 detected leaks under 2 GPH. <br /> • From pump start-up, the average leak sensing time to full flow was less than 5 seconds. <br /> • 125 ml vapor resiliency was added to the line system with no failures. <br /> • The LD-2000 detected leaks in the pipe system up to 10' above the leak detector. This test, <br /> called a "Head Pressure Reset Test," ensures that all buried pipe is protected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.