Laserfiche WebLink
1 Il I i 1 1 ♦ k ♦ 1 ! it ca ♦ �+ t ♦ l ♦ k { c� \ { ! i 1 ♦ t <br /> _ 4"s <br /> 5 <br /> Uadefground UggJ5 <br /> Two hoist bases were removed on October 9, 1991 during the demolition of the <br /> structure At 17 06 the bottom of the hoist excavation of hoist#1 was sampled, <br /> #H01-9 ata depth of 9 ft At 17.12 the bottom of the host excavation of hoist#2 was <br /> sampled,#H02-9 at a depth of 9 ft <br /> Sol, <br /> The excavated soil was placed on visqueen and covered with vtsqueen on site(see <br /> Figure 3) The site and the soil piles were secured by 6 foot high fencing The <br /> �" quantities of soil removed was estimated at 450 to 500 cubic yards <br />