Laserfiche WebLink
r • <br /> Sutton and Teed-Bose - 3 - 19 April 2004 <br /> existing land application areas. Quarterly monitoring reports shall be submitted by the 20th day of the <br /> month following the end of the quarter(i.e., the second quarter report is due 20 July). <br /> Surface Water Runoff <br /> Use of the new Proposed Reclamation Field will constitute implementation of Phase H of the wastewater <br /> system. Therefore, the drainage facilities must be reconfigured to collect surface water runoff as <br /> described in Finding No. 14 of Waste Discharge Requirements Order No. 98-109. By 30 September <br /> 2004, the Discharger shall submit a workplan to install the surface water collection equipment. The <br /> workplan shall include a schedule of implementation that shows all the collection equipment installed by <br /> 1 June 2005. <br /> As required by the California Business and Professions Code Sections 6735, 7835, and 7835.1, all <br /> groundwater monitoring reports shall be prepared under the supervision of a California registered <br /> professional engineer or geologist and signed by the registered professional. <br /> If you have questions on this response letter please telephone me at (916) 464-4616. <br /> TIMOTHY VBRIEN <br /> Waste Discharge to Land Unit <br /> cc: Mike Huggins, San Joaquin County Department of Environmental Health, Stockton <br /> Stephen Bayley, City of Tracy Public Works Department, Tracy <br /> Jeff Willett, Condor Earth Technologies, Sonora <br /> Rich Stowell, Eco:Logic,Roseville <br /> W�SIulf9birnl15w laa9uiuW—win HwsAulwnB e19A KC <br />