Laserfiche WebLink
Site Background Information <br /> . . 4 <br /> WELDON CHURCH PROPERTY , <br /> I104 West Beverly Place,-Tracy, California : <br /> collected.at discrete"'depth intervals from the majority-of the probe borings. Figure 2 depicts the <br /> locations of the-probe borings. <br /> TPH- was detected in�ihree;of the soil sam les anal zed at concentrations as high 2,800 m a <br /> g . p - Y g g/g <br /> (P3-6).,BTEX compounds were*,detected in the same three, samples at concentrations as high a& <br /> .93.ni total xylene,P1-6 ,.the s.2.8 maximum benzene concentration detected was mg/kg(PI.6). <br /> • gig( Y ) - <br /> Table 1 summarizes the soil samples•collected from tlie.probe borings,the site: . <br />�. TPH- was detected in ab water samples at concentrations as hi as' 210 000 -m 1. •BTEX <br /> .g ,grab . . P . high � -mg/l. , <br /> compounds were also detected in four of five grab ground water,samples at concentrations-as high <br /> as 35,000,mg/l (toluene P6), the maximum benzene concentration detected'was 12,000 mg/l (P6).. <br /> Analytical.results of•grab water,sarrP. <br /> iles are summarized-ori Table 2. The installation'of the soil ; <br /> probe borings was summarized in the PIER prepared by AGE, dated 10 September 1996. ' r_ <br /> Between July 1996 and April 1998 a total of six wells were installed on the site or on surrounding, .' <br /> properties in order to determine the lateral and vertical limits of.the dissolved hydrocarbon plume. <br /> In July 1996, four soil ,borings. were,drilled and completed as 2-inch diameter ground .water <br />� . <br /> monitoring wells with slotted screen from approximately 5 to 25_feet bsg. <br /> In April.1997,soil borings B5 (MW-5)and B6(MW-6)were drilled and completed as ground water <br /> • monitoring wells. Monitoring well MW-5 was completed using 2-inch diameter PVC casing with <br /> I a slotted.screen from approximately 3 to 10 feet bsg.Ground water monitoring well MW-6 was dual- <br /> com'Oleted with screen intervals installed from a depth of 20 to 23 feet bsg and 3 to 13 feet bsg. The <br /> installation of the first four monitoring wells was summarized in the PIER prepared by AGE,,dated. <br /> 10 September 1996.- <br /> On- <br /> 996,On'07 May 1998, soil borings B 13 through B 15'were advanced manually and one,boring Was- <br /> corn pleted, <br /> as'completed,as aground water monitoring well.Borings B 13;B 14(MW-7)and B-15 were established <br /> on the property at 52 West Beverly Place. The;installation of the borings was,performed using a <br /> six-inch diameter hand auger.., <br /> On 09.and 10,June and 26 August 2003;nine soil probe borings(B16 throu&B24)were advanced <br /> on- and off.-site: <br /> Seventeen.soil,simples were.analyzed;.TPH-g and various BTEX compounds were-detecfed-in <br /> samples B1775, 818-1'0 and B20-8, afmaximum concentrations-of 15 milligrams,per kilogram <br /> .(mg/kg) TPH-g (1320-8),0.52 mg/kg-benzene (B18=10), 0:18 mg/kg''toluene (B17-5), 0.24 mg/kg <br />' ethylberi'zene(B1 775)and 2.15 mg/kg xylenes(B17-5);xylenes was also detected in sample B 16-5.5 <br /> at 0.006 nig/kg.'The fuel additive MTBE was detected in the four soil samples anaiyzedfrom borings' - <br /> B 17 and B 18, at a•maximum concentration'of 0.29 mg/kg (1317-5).:MTBE was detected in:soil <br /> Advanced GeoEnvironmentai,Inc. <br />